THE IMPLEMENTATION PLAN

A development plan for Roseburg and the surrounding region.

The proposal identifies where to focus housing, employment, commercial development and public improvements. Each chapter sets out the responsible parties, decisions, costs and constraints needed to move from a concept to a funded project.

What needs to change

INITIAL PRIORITIES

Concentrate the first investments where they can be delivered.

The plan concentrates early investment in existing commercial districts, reusable buildings and neighborhoods with service capacity. It pairs those projects with action on rail delays, safer crossings and park access. Bend provides inspiration for an active community; Roseburg’s own households, employers, rivers and infrastructure must determine the scale and form of development.

The proposal starts with the places and needs residents already recognize: downtown storefronts, busy shopping corridors, housing near services, interrupted rail crossings and gaps between homes and parks. The chapters below explain the recommended changes, where they could happen, and the work needed to turn them into funded projects.

Greater Roseburg Tomorrow is an independent community proposal. The maps and cost ranges give people something specific to discuss; official approvals and funding decisions remain with the relevant public bodies and property owners.

INITIAL DECISION 1

Agree on a regional planning and service baseline.

An agreed description of the region, with a public account of service costs and the contributions already made by residents, users and districts.

Proposed participants: City, County and partner governments with providers and residents.

INITIAL DECISION 2

Choose a concentrated downtown pilot.

Three to five nearby buildings with willing owners, priced reuse options, prospective tenants and a clear approval process.

Proposed participants: Willing property owners, City reviewers and qualified developers/operators.

INITIAL DECISION 3

Verify flagship and retail sites.

An understandable comparison of property conditions, permitted uses, access, costs, competing businesses and operating economics.

Proposed participants: Owners, operators, planners and independent technical advisers.

Read the November 8 planning baseline.

The 52-page study and 10-page concept atlas preserve the November 8, 2026 research baseline. Later additions are documented on the Updates page and linked current chapters. The research page explains the sources and limits of the estimates.

Read the research and maps

RELIABLE TRIPS, SAFER CONNECTIONS

Reduce rail disruption and improve everyday access.

The transport program begins with measurable problems: rail closure duration, queues, difficult crossings and gaps between transit stops and destinations. Targeted signal and access work can be assessed alongside larger network changes. A bridge or underpass requires a public comparison of locations, benefits, engineering constraints and cost.

Traffic and rail

Measure rail closures and reduce avoidable disruption

Record gate-down times, queues and simultaneous closures, then agree on operational changes with the railroad and road agencies.

A shared record of rail closures is the first requirement for choosing an effective intervention. The study should measure gate-down time, queue length and combinations of closures that affect emergency access, work trips and appointments. Those findings would guide operating changes and identify where a bridge or underpass warrants further investigation.

Locations and connections

  • Garden Valley Road rail crossing
  • Stewart Parkway/Alameda rail crossing
  • Oak Avenue, Washington Avenue, Douglas Street and Mosher Avenue crossings

Existing conditions

The Oregon Department of Transportation’s crossing inventory identifies the locations and road authorities. Current operating conditions still need to be measured at each crossing.

Residents’ reports establish a concern to investigate; this plan does not yet have a verified count of how many closures occur each day.

Proposed actions

  1. Record 30–90 days of gate closures, simultaneous blockages, queue lengths, standing versus moving trains and emergency-response effects.
  2. Publish typical and worst-case crossing delay, including the 95th percentile, by time of day.
  3. Have road agencies, CORP and emergency services assess legal signal-interconnection, queue-management and operating changes.
  4. Confirm which existing alternatives are usable during different closure patterns, then publish clear guidance. Reliable live train prediction would require a separate system and evidence.

Intended benefits

  • A common evidence base for residents and agencies
  • Quicker low-cost operational fixes where feasible
  • A defensible case for larger investment

Proposed phase

Start in first 100 days; operational actions in months 4–24.

Proposed delivery lead

A jointly appointed transportation lead from Roseburg and Douglas County. These are proposed responsibilities; participation would need to be agreed.

Others to involve: ODOT Rail and highway staff · Central Oregon & Pacific Railroad (CORP) · Fire and emergency medical services · School transportation · Umpqua Public Transportation District.

Dependencies

  • Agency/railroad data and access agreements
  • Current traffic and emergency-route validation
  • A staffed owner for ongoing reliability reporting

Measures of progress

  • Minutes of closure by crossing
  • Simultaneous closures
  • 95th-percentile delay
  • Emergency access during closure events

Cost allowances and scope

These early estimates are in 2026 dollars. Several projects share the same overall allowance, so the amounts below are not added together.

Shared first-100-day preparation · $1–2M

Allowance for the complete first-100-day professional work program

The initial professional work would cover the regional baseline, early business and property reviews, and other preparation. No transport-only share has yet been assigned.

Included in the planning and delivery budget; this is not an additional transportation allocation.

City rail alternatives and preliminary design · $2–4M

Allowance for study and preliminary design

A preliminary allowance for comparing city crossing alternatives and developing an initial design. A defined professional scope is needed before procurement.

Included within the $80–180 million long-term rail program.

Traffic and rail

Compare bridge and underpass alternatives at the main rail bottlenecks

Evaluate Garden Valley, Stewart Parkway and downtown alternatives for reliable access, engineering feasibility and cost.

Garden Valley, Stewart Parkway and the downtown crossings have different access needs and physical constraints. A public alternatives study should compare a bridge or underpass with operational and network improvements. The assessment must include nearby homes and businesses, river conditions, airport compatibility and emergency routes before selecting a location.

Locations and connections

  • Garden Valley/Stewart corridor
  • Downtown Oak/Washington/Douglas corridor
  • Separate County study at Old Highway 99 near Wilbur

Existing conditions

The City’s Transportation System Plan contains earlier alternatives that can inform the comparison. Their engineering and costs would need to be updated.

On November 6, 2026, Douglas County announced up to $1,763,336 in federal funds for a separate study and preliminary engineering at Old Highway 99 near Wilbur. The estimated $2,204,171 study and development cost includes a County match. That award does not fund construction or resolve the crossings in downtown Roseburg.

Proposed actions

  1. Compare bridge, underpass and alternative-route options against measured closure relief, emergency access, grades, ramps, traffic redistribution and life-cycle cost.
  2. Screen Stewart-area elevations against airport approach surfaces before favoring an overpass.
  3. Assess downtown river proximity, flood risk, historic buildings, land acquisition, utilities and construction access.
  4. Coordinate with the Wilbur study while keeping its benefits separate from downtown Roseburg crossings.
  5. Advance one preferred option only after railroad/road approvals, environmental review, rights, independent estimate and complete funding.

Intended benefits

  • A realistic path to reliable cross-town travel
  • Less risk of spending on an unbuildable alignment
  • Public comparison of cost and disruption before commitment

Proposed phase

Study/preliminary design in years 1–3; construction in years 5–10 only if justified and funded.

Proposed delivery lead

A partnership of Roseburg, Douglas County and the Oregon Department of Transportation. These are proposed responsibilities; participation would need to be agreed.

Others to involve: Central Oregon & Pacific Railroad · FAA/airport staff where relevant · Federal Railroad Administration · Affected owners · Emergency services · Historic/environmental reviewers.

Dependencies

  • No preferred engineered alignment has been selected
  • Airport, river, rail and property constraints
  • Required authorizations and construction funding
  • A second project must separately demonstrate need

Measures of progress

  • Preferred alternative decision with published tradeoffs
  • Verified emergency-access benefit
  • Engineering estimate and funded scope
  • Construction disruption plan

Cost allowances and scope

These early estimates are in 2026 dollars. Several projects share the same overall allowance, so the amounts below are not added together.

City rail alternatives and preliminary design · $2–4M

Allowance for study and preliminary design

A preliminary allowance for comparing city crossing alternatives and developing an initial design. A defined professional scope is needed before procurement.

Included within the $80–180 million long-term rail program.

One justified major rail separation · $40–90M

Allowance for one feasible project

An initial allowance for one feasible crossing project, before a site-specific engineering estimate.

Included within the $80–180 million rail program, together with study and design costs.

  • Complex combined river/rail works can exceed this range.
  • Actual land, utilities, geometry, construction staging and environmental work remain unpriced.
Long-term rail provision · $80–180M

Allowance over twenty years

A twenty-year allowance for planning and a major crossing project, with a second considered only if a separate case supports it.

Included in the $400–830 million shared infrastructure and civic subtotal.

Traffic and access

Improve signals, entrances and crossings on the main corridors

Coordinate targeted road improvements along Garden Valley, Stewart, Harvard, Diamond Lake and North Stephens.

The corridor program combines signal coordination with access management and pedestrian crossing improvements. Garden Valley and Stewart serve shopping and the proposed fitness club; Harvard connects neighborhoods and parks; Diamond Lake and North Stephens serve homes, services and jobs. Larger extensions should be compared with these targeted improvements using current traffic and cost evidence.

Locations and connections

  • Garden Valley Boulevard and Stewart Parkway
  • I-5 exits 124/125 study area
  • Harvard Avenue
  • Diamond Lake Boulevard/OR 138E
  • North Stephens and southern Roseburg/Green corridors

Existing conditions

Existing City and Oregon Department of Transportation studies already account for regional commuters. This proposal would carry that work into a coordinated list of improvements.

The OR 138E corridor has a design-concept process underway. Earlier transportation plans also identify Stewart connections, an Edenbower extension and a west-side Harvard–Charter Oaks bridge concept. Those ideas require current review before any construction decision.

Proposed actions

  1. Coordinate signal timing and queue-management across intersections rather than fixing each junction in isolation.
  2. Review driveway consolidation, shared access and links between shopping properties with owners.
  3. Deliver safer Harvard neighborhood/park crossings and coordinate Diamond Lake improvements through the existing OR 138E process.
  4. Refresh extension and river-link alternatives against current demand, utilities, property rights and costs.
  5. Require housing, retail and employment projects to provide their share of frontage, crossings and access work without double-counting common infrastructure.

Intended benefits

  • More predictable everyday trips
  • Safer turning and crossing movements
  • Better access to local businesses without defaulting to corridor-wide widening

Proposed phase

Quick operational work in years 1–2; scoped corridor projects in years 2–7.

Proposed delivery lead

City of Roseburg Public Works with the responsible County/ODOT road authority. These are proposed responsibilities; participation would need to be agreed.

Others to involve: Businesses and property owners · Umpqua Public Transportation District · Emergency services · Community development staff.

Dependencies

  • Current corridor traffic/turn counts
  • Road authority and access permits
  • Property agreements
  • Coordination with existing funded projects

Measures of progress

  • Travel-time reliability
  • Queue spillback
  • Crossing delay and accessibility
  • Business and bus access
  • Crash and conflict trends

Cost allowances and scope

These early estimates are in 2026 dollars. Several projects share the same overall allowance, so the amounts below are not added together.

Other streets, transit access and walking/cycling · $50–100M

Allowance for selected corridors over twenty years

A preliminary allowance for selected corridor improvements and access to transit, walking and cycling. Individual road and service projects still need a priced scope.

Walking and cycling costs are shared with the parks budget and must be counted once.

Regional access

Coordinate regional transit and the walk to the destination

Study journeys from Green, Winston, Winchester, Wilbur, Sutherlin and other communities, including travel outside office hours.

Regional transport planning should cover the complete journey: service hours, interchange, accessible stops and the final walk to work or an appointment. The study includes shift workers and residents traveling from surrounding communities. Ground connections to Eugene and Medford airports should be compared with the cost and demand case for expanded local aviation.

Locations and connections

  • Green/Winston to Roseburg
  • Winchester/Wilbur/Sutherlin to Roseburg
  • North Stephens employment and service corridor
  • Partner-town centers, schools, clinics and shopping destinations

Existing conditions

Regional service changes would need to be developed with Umpqua Public Transportation District using current demand, timetable and cost information. No new route or frequency has been agreed.

Winchester Elementary at 217 Pioneer Way is one identified destination. The routes serving it would need to reflect current attendance and campus-access arrangements.

Proposed actions

  1. Measure trip origins and destinations by purpose, including workers whose shifts begin or end outside standard office hours.
  2. Evaluate bus frequency, evening service and timed connections with the transit district and affected communities.
  3. Pair service changes with accessible stops, lighting where appropriate, safe crossings and last-block routes to actual doors.
  4. Test reliable ground connections to Eugene and Medford commercial airports as an immediate air-access option.
  5. Use agreements with participating agencies to allocate capital and recurring operating costs; regional participation does not require blanket annexation.

Intended benefits

  • Better access to work, shopping and recreation
  • Less isolation for people unable to drive
  • A practical air-access improvement before a local airline proposal

Proposed phase

Service/demand audit in year 1; limited funded pilots in years 1–3; expand from results.

Proposed delivery lead

Umpqua Public Transportation District, working with Douglas County and willing participating cities. These are proposed responsibilities; participation would need to be agreed.

Others to involve: Employers · Schools and Umpqua Community College · Health providers · Airport ground-transport operators · Residents of unincorporated communities.

Dependencies

  • An operator and sustainable service funding
  • Accessible stops and lawful rights
  • Demand and fare/operating analysis
  • Public review of tradeoffs

Measures of progress

  • Usable connections at key shift times
  • Boardings and cost per passenger
  • Access to jobs and services
  • On-time performance
  • Accessibility of stops and connecting paths

Cost allowances and scope

These early estimates are in 2026 dollars. Several projects share the same overall allowance, so the amounts below are not added together.

Other streets, transit access and walking/cycling · $50–100M

Allowance for selected corridors over twenty years

A preliminary allowance for selected corridor improvements and access to transit, walking and cycling. Individual road and service projects still need a priced scope.

Walking and cycling costs are shared with the parks budget and must be counted once.

See rail crossings, traffic stations and street context

PUT THE RIGHT USES IN THE RIGHT PLACES

Define the role of each development area.

Eight planning areas organize the proposed investment. Downtown is the focus for building reuse, independent businesses and upper-floor homes. Stewart Parkway and Garden Valley are the focus for larger retail and fitness proposals. Housing should follow verified service capacity and connect to daily needs. The district recommendations below remain subject to owner participation, public review and project-specific funding.

A PLACE IN THE PLAN

Downtown and the central riverfront

Jackson and Main streets, around the Douglas, Oak, Cass and Lane blocks

Concentrate the first downtown projects in a group of neighboring buildings around Jackson and Main. A bakery, independent shops, restaurants and suitable upper-floor homes would support activity across the day. A children’s discovery or maker studio is another proposed use where an appropriate building and operator are available. The cluster should connect directly to nearby public spaces.

Initial actions

  • The first phase would bring three to five willing property owners together around a shared block or short walking route.
  • Building inspections would establish what each space can safely accommodate and what repairs, accessibility improvements and historic reviews it needs.
  • Existing businesses would help shape opening hours, outdoor seating, events and street improvements so the new activity strengthens the district.

Next decision

The first buildings should be chosen for their combination of willing owners, viable tenants and affordable rehabilitation. A small, visible cluster would make a stronger start than scattered projects that leave long inactive stretches between them.

Constraints and tradeoffs

Rehabilitation costs can be difficult to predict. Existing tenants and attainable homes should be considered early so improvements bring more life to downtown without casually displacing the people already there.

Proposed participants

Willing property owners · Roseburg Community Development · Historic Resource Review Commission · Building officials · Downtown businesses · Qualified rehabilitation developers

A PLACE IN THE PLAN

Stewart Parkway and Garden Valley

The established shopping corridor and its large commercial buildings

Use the established shopping corridor for the proposed premium fitness club, specialty grocery search and additional food and retail businesses. Assess reusable buildings first. Coordinate crossings, shared entrances, loading and paths between properties so access improvements serve the district as a whole.

Initial actions

  • The former Albertsons at 3013 NW Stewart Parkway would be assessed for the proposed gym, including its building condition, lease terms and conversion cost.
  • The separate spaces at 2455 and 2475 NW Stewart Parkway would be assessed for grocery, shops and food, using each space’s actual available area.
  • Property owners and transportation staff would design access, loading, parking and crossings together rather than treating each new business as an isolated project.

Next decision

A business should advance when the operator, building and customer demand fit one another. The next step is to compare occupancy and conversion costs with the prices and sales the business could realistically achieve.

Constraints and tradeoffs

Additional choice is valuable, but some spending will shift between local businesses. Recruitment and any public support should respond to a demonstrated gap and a sound operating plan.

Proposed participants

Property owners and leasing agents · Qualified operators · Roseburg planning and public works · ODOT where state facilities are affected

A PLACE IN THE PLAN

Charter Oaks

Land added to the urban growth boundary, with each parcel’s current status to be confirmed

Plan housing of varied sizes with connected streets, public paths and nearby play space from the first occupied phase. Assess small daily-service businesses where the adopted plan and zoning allow them, or through an evidence-supported change. Infrastructure capacity and the cost of extensions must determine the first developable area.

Initial actions

  • The City, County and owners would establish which parcels are inside the city and which approvals remain after the urban growth boundary change.
  • Water, sewer, drainage, connected streets and emergency access would be designed around a first buildable phase.
  • Before homes are committed, developers and public providers would agree who pays for shared infrastructure and maintains it.

Next decision

The first neighborhood phase should be the one that can receive dependable services at an achievable cost. That choice needs a clear agreement on any off-site upgrades.

Constraints and tradeoffs

Being inside an urban growth boundary does not make land ready to build on. Utility extensions and access can change the cost of an otherwise attractive site substantially.

Proposed participants

Roseburg and Douglas County · Affected owners and utility providers · Developers · Fire/EMS · Relevant school district

A PLACE IN THE PLAN

Diamond Lake and Rifle Range

Eastside opportunities, including the published Rifle Range inventory property R40164

Investigate eastside housing and compatible daily services alongside the OR 138E planning work. The Rifle Range property is a candidate for assessment, with land-use designations, access and service conditions to resolve before any residential program is treated as feasible.

Initial actions

  • An owner discussion and property review would establish availability, exact boundaries and how much land could actually be developed.
  • Planners would resolve the published Industrial comprehensive-plan designation and Mixed Use zoning, including any changes needed for housing.
  • The assessment would compare housing benefits with the need to retain land for employment, while testing access, utilities and hazards.

Next decision

A housing proposal should proceed only if it can receive the required approvals, work financially and preserve sufficient land for the region’s employment needs.

Constraints and tradeoffs

The published inventory identifies 11.43 acres, but neither that acreage nor the Mixed Use zoning establishes approval for homes. The comprehensive plan and site conditions still matter.

Proposed participants

Roseburg Community Development · Property owner · Housing developer · Utility providers · ODOT

A PLACE IN THE PLAN

Green

Carnes, Cannon and Austin roads and the surrounding established neighborhoods

Strengthen Green’s existing centers, add housing where services support it and connect homes, schools and parks. The Ray’s center at 4601 Carnes is an initial location for complementary small businesses. A joint service review should establish how current providers can deliver the first improvements and how costs will be shared.

Initial actions

  • A joint service review would identify the agencies responsible for water, sewer, roads, emergency response and parks, and where capacity needs improvement.
  • Residents and existing businesses would help identify gaps in food choices, local services and safe access.
  • For any specific boundary proposal, leaders would compare annexation with service agreements and explain the effect on taxes, fees, responsibilities and residents.

Next decision

The immediate question is which improvements existing providers can deliver together. Annexation should be evaluated only for a defined area where it improves the service and financial outcome.

Constraints and tradeoffs

Green already has businesses, homes and a grocer. New investment should make those places more useful and accessible while responding to needs residents actually identify.

Proposed participants

Douglas County · Affected water and sanitary providers · Roseburg where services are shared · Residents · Owners and local operators

A PLACE IN THE PLAN

Winchester and Umpqua Community College

Existing neighborhoods and routes to education, employment and services

Focus on smaller housing additions in established areas and practical connections to Umpqua Community College, jobs and transit. Evaluate actual parcels against utility capacity, river conditions and airport constraints. The first phase should reduce a documented access or housing gap without depending on unpriced infrastructure extensions.

Initial actions

  • Residents, providers and landowners would identify actual properties and the services available to them.
  • A site review would account for river conditions, airport compatibility, road safety and utility limits.
  • Housing and small-service proposals would be tested against the needs of students, workers and existing neighbors.

Next decision

The best first phase would make daily trips easier while using infrastructure that can support it. A service agreement may be enough to move that work forward.

Constraints and tradeoffs

River and airport constraints can reduce usable land. A modest project with dependable services may be more practical than a broad expansion requiring costly new infrastructure.

Proposed participants

Douglas County · UCC · Roseburg where relevant · Utility and transit providers · Residents and landowners

A PLACE IN THE PLAN

Airport–Edenbower and existing employment sites

Industrial and compatible commercial land with practical access to utilities

Protect suitable employment land around Airport–Edenbower and other serviced sites. Match credible employer expansions with power, water, freight access and training capacity. Aviation compatibility must guide uses near the airport, and entertainment or housing conversions require an explicit assessment of the employment land they would remove.

Initial actions

  • An updated site inventory would be paired with specific expansion needs from employers already here and firms considering the region.
  • Economic development partners would connect each viable project to utility capacity, freight access and relevant training programs.
  • The separate Kenneth Ford family-center candidate would receive its own land-use review; its public-reserve zoning cannot be assumed to allow commercial recreation.

Next decision

The first investments should remove a specific obstacle for a credible employer expansion, ideally on land that already has most of the infrastructure it needs.

Constraints and tradeoffs

Using scarce employment land for housing or entertainment has a long-term cost. Each conversion should be weighed against the jobs and business activity the site could otherwise support.

Proposed participants

Roseburg and Douglas County · Airport management · UEDP · CCD · Employers · Utility providers

A PLACE IN THE PLAN

The region’s smaller town centers

Drain, Yoncalla, Sutherlin, Oakland, Winston, Myrtle Creek, Tri-City, Riddle, Canyonville and rural service centers

Support locally selected projects in established town centers: reusable business premises, cottages, duplexes and small apartments, school routes and park access. Each participating community should identify its first project and the assistance it needs. The regional partnership can coordinate expertise and funding applications while local decisions remain with the responsible governments.

Initial actions

  • Each participating community would identify a short list of locally supported housing, business and recreation priorities.
  • Sites within established centers and reusable buildings would be considered before expansion onto more distant land.
  • The regional partnership could help with employer access, funding applications, family programming and maintenance arrangements that are difficult to organize alone.

Next decision

Each community should be able to name a first project and the help required to make it possible. That could be a building conversion, a housing phase, a park entrance or a missing sidewalk.

Constraints and tradeoffs

Roseburg can host major regional destinations while surrounding towns remain strong places to live. Local decisions and community identity should remain with the people who live there.

Proposed participants

Participating city governments · Douglas County for unincorporated areas · Residents · Schools · Owners and businesses

Find the planning areas on the map

When would annexation make sense?

Three lines on a map can describe different things: the city boundary, the urban growth boundary and a utility’s service area. The urban growth boundary identifies land intended to accommodate urban development over time; it does not itself bring every property into the city or approve construction. A useful annexation proposal would explain exactly which land is affected, what services would change and what residents would pay.

ApproachAreas to considerDecision test
Investigate firstUrban islands, compact edges and serviceable land already within the UGBCan the city provide appropriate services efficiently, with a positive long-term fiscal case and a lawful path?
Coordinate as a neighborhoodCharter OaksA neighborhood plan would establish the current parcel status, the order of street and utility construction, and the obligations of each provider and developer.
Compare alternativesSelected contiguous urban parcels in Green and WinchesterCompare annexation with service agreements, including residents' interests, taxes/fees, inherited liabilities and affected districts.
Keep as regional partnersExisting separate municipalities including Winston, Sutherlin, Oakland, Drain, Yoncalla and Myrtle CreekThese communities would remain regional partners through shared projects and agreements; this plan does not propose their annexation into Roseburg.
Defer broad urban expansionRural Garden Valley, Melrose, Lookingglass, rural Dixonville, Wilbur and toward GlideProtect working lands and river corridors. Reconsider only when documented urban need, law and feasible services support it.

The services that need to work

  • Water capacity and pressure
  • Sewer conveyance and treatment
  • Stormwater and flood risk
  • Power and communications
  • Road and emergency access
  • Park and public-safety capacity
  • Affected district assets, debts and duties

How a proposed change would be reviewed

  1. Confirm the parcel, owner, current comprehensive-plan designation, base zoning and every overlay.
  2. Hold a documented preapplication review with the agencies that would actually decide the proposal.
  3. Establish the demonstrated need and compare lawful alternatives; identify whether a plan amendment, zone change, annexation or other approval is needed.
  4. Resolve utility and access obligations, hazard/environmental constraints and employment-land impacts before promising a program.
  5. Use the applicable public process and record findings. Tie construction commitments to final approvals and feasible financing.

HOUSING AND NEIGHBORHOODS

More housing choices near jobs and services.

The housing proposal includes first apartments, family homes, smaller homes near services and housing affordable to people with limited incomes. New construction and repairs to existing homes are both needed. Streets, utilities and parks belong in the same project budget, with delivery paced to demonstrated demand and construction capacity.

Household incomeAllocated homesWhat would make these homes possible
0–30% of area median income1,372Deeply affordable and supportive homes with durable operating and service support.
31–60%1,083Affordable rental/ownership partnerships with sound subsidy and debt underwriting.
61–80%640Smaller homes and workforce options priced against local earnings.
81–120%913Attainable market and mixed-income housing with efficient land and infrastructure.
Above 120%1,899Market homes in varied sizes; part of a balanced housing program.

Income bands are measured against area median income, the midpoint household income used by housing programs. The mix below comes from the state allocation.

Where more homes could fit

Downtown upper floors and small infill sites

Small apartments above shops could put more residents within walking distance of food, services and events. Buildings would need to meet safety and accessibility requirements at rents that support their conversion.

Charter Oaks

A mix of family homes and smaller homes could share connected streets, parks and walking routes. Construction would follow a clear plan for utilities, access and approvals.

Rifle Range

Housing with compatible neighborhood services is worth investigating here. The first question is whether the land-use designations can support it without weakening the supply of employment land.

Green and Winchester

Smaller additions within established neighborhoods could provide family-sized homes and compact options near existing services, wherever utilities and access can support them.

Partner-town centers

Cottages, duplexes, townhouses and small apartments could help more people live near local shops, schools and parks, where the community’s rules and site conditions allow them.

Help existing residents stay part of the future

  • Repair assistance could help owners keep viable existing homes in use.
  • Publicly subsidized homes should carry long-term affordability commitments.
  • Qualified land-trust or shared-equity partners could help keep selected homes affordable for future buyers.
  • The public progress report should track rent burden, lost affordable homes and involuntary displacement alongside new construction.
  • Existing residents and businesses should be involved before redevelopment plans are fixed.

The 5,907-home figure applies to Roseburg’s urban growth boundary. A complete regional housing program would also account for the needs and allocations of participating communities. Those totals cannot be derived by multiplying the city figure by the wider population.

What would make the first phase possible

The first housing phases should combine available service capacity, a workable approval process and homes priced for the people expected to live in them. Developers, utilities and housing partners would need to show how both construction and ongoing support will be funded.

The number of homes is only one measure of success. Affordability, location, condition and access to daily life matter too, and each project needs a complete budget for infrastructure and any continuing services.

EMPLOYMENT AND HOUSEHOLD INCOMES

Grow employers and household incomes.

The employment strategy starts with existing firms that have credible expansion plans, then targets businesses whose needs fit the available workforce and land. Training should connect to verified vacancies. These five sectors provide a focused basis for employer conversations and site assessments; any resulting commitments must be established directly with the organizations involved.

AN AREA FOR JOB GROWTH

Healthcare and allied health

Medical employment areas, VA connections and UCC

A stronger route into health careers would connect local training with clinical placements and real vacancies. Employer partnerships could also address practical barriers such as housing, childcare and transport that make it difficult to complete training or stay in a job.

Organizations to invite into the discussion

Mercy · Veterans Affairs · Aviva · Umpqua Health · Umpqua Community College

The question to answer first

Which roles have verified hiring demand, and what blocks students or workers from filling them?

What success would look like

Completed training, filled positions, retention and wages.

AN AREA FOR JOB GROWTH

Advanced manufacturing, forestry technology and wood products

Existing industrial sites and compatible Airport–Edenbower land

The region can build on manufacturing, forestry and wood-products experience by helping firms modernize and expand. Suitable premises, reliable utilities and apprenticeships linked to actual openings would turn that ambition into an offer employers can evaluate.

Organizations to invite into the discussion

Existing manufacturers · Umpqua Community College · Umpqua Economic Development Partnership · CCD Business Development Corporation

The question to answer first

Which employer has a credible expansion plan that a specific site or workforce investment can unlock?

What success would look like

Net retained/added permanent jobs, wages, capital placed and employer survival.

AN AREA FOR JOB GROWTH

Small technology and professional firms

Downtown and connected commercial buildings

Smaller technology and professional firms could bring year-round payroll to downtown and other connected commercial buildings. The useful offer is straightforward: dependable internet, workspaces of different sizes, access to talent and a place employees enjoy spending time.

Organizations to invite into the discussion

Local firms · Property owners · Umpqua Economic Development Partnership · Umpqua Community College

The question to answer first

Can several firms commit to space and hiring at rents that support the building?

What success would look like

Occupied space, year-round payroll and locally retained jobs.

AN AREA FOR JOB GROWTH

Value-added food and outdoor businesses

Appropriate serviced commercial/industrial land throughout the corridor

Food producers and outdoor businesses could use appropriate commercial and industrial space to make, service or distribute products. Shared production facilities would make sense only where paying customers, a capable operator and a practical distribution plan support them.

Organizations to invite into the discussion

Local producers · Existing businesses · CCD Business Development Corporation · Umpqua Economic Development Partnership

The question to answer first

What demonstrated customer demand and distribution channel supports the facility?

What success would look like

Sales beyond the region, business survival and jobs with advancement.

AN AREA FOR JOB GROWTH

Visitor spending and year-round recreation

Downtown, riverfront, established attractions and partner-town centers

Dining, events and recreation can give residents and visitors more reasons to spend time across the region. The priority would be experiences that complement existing attractions, encourage repeat visits and support employment through quieter seasons as well as busy weekends.

Organizations to invite into the discussion

Existing attractions · Hospitality operators · Local businesses · Community event organizers

The question to answer first

Which offer adds weekday or off-season spending and can operate without a permanent unpriced subsidy?

What success would look like

Repeat visits, year-round jobs and actual operating performance.

A downtown home for entrepreneurs and a fuller local economy

A proposed entrepreneur commons would combine coffee, work and study space, meetings and structured business support in a suitable reused downtown building. Roseburg already has advising, pitch events and coworking; a modest pilot should test which additional access, hours and services people will use and pay for.

Explore the entrepreneur commons

Retail recruitment also needs evidence of the purchases households make outside the study region. The local-economy chapter explains how to investigate those trips, distinguish business sales from public revenue and test coordinated evening activity with willing operators.

Measure the spending opportunityTry the illustrative spending calculatorPlan a useful evening offer

Connect opportunity to local training

Umpqua Community College announced a $21.5 million Welcome Center and Medical Careers Hub, with completion scheduled for December 2026 and an early-2027 opening. The announcement also describes an Advanced Manufacturing & Forestry Hub. Those investments give employers and educators a concrete starting point for training partnerships; each partnership would need to match the facilities’ confirmed opening dates and capacity.

How to help employers take the next step

  • The proposed first round would include major employers and 20–30 promising smaller firms, asking what would allow them to hire or expand.
  • A shared list would identify the practical barriers: workers, premises, utilities, permitting, housing, childcare or transportation.
  • Public support would be tied to written hiring or training commitments, with milestones and appropriate repayment terms if commitments are not met.
  • Progress would be reported as positions actually filled or retained, with wages and benefits visible. Temporary construction jobs and transfers would be counted separately.

Proposed coordination: Umpqua Economic Development Partnership and CCD Business Development Corporation could coordinate this work with employers, Umpqua Community College and participating governments. Their participation would need to be agreed.

PARKS, TRAILS AND LOCAL CONNECTIONS

Connect neighborhoods, parks and daily destinations.

The parks and trails program connects existing destinations through missing path segments, accessible entrances and safer crossings. Local routes should serve school trips, errands and recreation in Roseburg and partner communities. Shade, working restrooms, seating and funded maintenance are part of the same investment.

Parks and paths

Connect the river parks and improve family facilities

Link Stewart, River Front, Gaddis and Fir Grove through clearer entrances, accessible paths and useful amenities.

The proposed river-park program improves access to places already in use. Priorities include path gaps, crossings, dependable restrooms, shade and seating, with an inclusive playground and stronger connections toward downtown for assessment. Each capital project needs an identified maintenance responsibility so facilities remain usable after opening.

Locations and connections

  • Stewart Park
  • River Front Park
  • Gaddis Park/Umpqua Greenway
  • Fir Grove park area
  • Downtown–Micelli–Templin approaches

Existing conditions

City maps and the 2023 cycling inventory show the existing paths and park facilities. A current walk-through would identify surface, entrance and accessibility problems that need attention.

A September 2026 City packet proposed an expanded Stewart, Gaddis and Umpqua Greenway planning scope, with a $289,020 professional-services proposal and expected completion in fall 2027. Additional work should fit the scope and milestones ultimately agreed by the City.

Proposed actions

  1. Coordinate additions through the existing parks planning process.
  2. Complete accessible neighborhood entrances, wayfinding, short street-to-path links and difficult crossings.
  3. Create a large inclusive adventure playground and shaded family seating zone at a Stewart Park location selected through the park approval process.
  4. Audit downtown–Micelli/Templin transitions, including Mosher rail-crossing changes with the proper authorities.
  5. Repair restrooms, surfaces and lighting where appropriate, and publish opening/maintenance standards.

Intended benefits

  • More free and affordable family activity
  • A recognizable park-to-downtown experience
  • Useful short walking and cycling trips for all ages

Proposed phase

Repairs/access audit immediately; plan-coordinated first packages years 1–3.

Proposed delivery lead

City parks and public works teams. These are proposed responsibilities; participation would need to be agreed.

Others to involve: Parks commission/master-plan team · Disability access advisers · Families/teenagers · Nearby residents · ODOT/CORP at rail interfaces.

Dependencies

  • Current park-plan decisions and footprint
  • Floodplain/riparian protection
  • Accessible actual entrances
  • Maintenance and programming funds

Measures of progress

  • Working restrooms and usable routes
  • Accessible entrances
  • Park use and repeat visits
  • Repair-response time
  • Completed trips to downtown

Cost allowances and scope

These early estimates are in 2026 dollars. Several projects share the same overall allowance, so the amounts below are not added together.

Parks, trails and bounded family recreation · $50–100M

Allowance over twenty years

A preliminary twenty-year allowance for selected parks, trails, play spaces and community recreation. Each project needs its own design and operating plan.

Play areas and a discovery studio would be selected within this amount. The gym and large family center are counted in commercial development.

Inclusive Stewart Park family play package · $3–6M

Initial play, shade and access improvements

An initial allowance for an inclusive play area, shade and access improvements selected through the Stewart Park planning process.

Included within the $50–100 million parks budget.

Connected walking and cycling program · $45–75M

Allowance over ten years

A ten-year scenario for approximately 15–25 miles of short connections and retrofits, plus 25–40 improved crossings. The mix of treatments will determine how much can be delivered.

Included across the streets and parks budgets, after accounting for completed and already funded work.

  • Major river, rail and I-5 structures require separate study and budgets.
  • No surveyed route-mile or completed engineering schedule supports this envelope yet.
Path-network maintenance provision · $0.5–1M

Annual cost once the network is established

An annual allowance for inspection, sweeping, vegetation, drainage, lighting, markings and resurfacing as the network grows.

Part of recurring operations rather than construction. It must be reconciled within the broader $15–30 million annual public and service scenario.

Parks and paths

Link Newton Creek, Duck Pond and Garden Valley destinations

Complete short walking and cycling gaps between parks, shopping and the proposed fitness and retail locations.

The Newton Creek, Duck Pond and Garden Valley proposals focus on routes that connect actual entrances. A continuous path must work through driveways and crossings as well as within parks. Short gaps, direct storefront access and useful bicycle parking should be evaluated together, so a completed segment supports an entire trip.

Locations and connections

  • Newton Creek: Hucrest/YMCA and Gardiner/Renann–Stewart gaps
  • Duck Pond Street to I-5 path alternatives
  • Garden Valley Boulevard shopping
  • Harvard–Fir Grove–Stewart links
  • Proposed fitness, grocery and shopping locations on NW Stewart Parkway

Existing conditions

The published Bike Routes Plan includes concepts for the Newton Creek, Duck Pond, Garden Valley and Fir Grove connections. They identify possibilities; current completion, property rights and engineering still need confirmation.

The YMCA, parks, shops and existing paths already provide reasons to make these trips. The proposed premium gym would be an additional destination if the building and operator case succeeds.

Proposed actions

  1. Prioritize Newton Creek missing links and the Duck Pond–I-5 connection, with a current engineering and ownership audit.
  2. Compare Garden Valley public-right-of-way and VA-campus alternatives; an institutional route needs an agreement.
  3. Make shopping-center driveways and entrances part of the route design, with convenient secure bike parking.
  4. Treat Harvard and the Fir Grove–Stewart gap as distinct packages with their own rights and crossing requirements.
  5. Plan the connection around Fir Grove Park and account for the school district’s planned closure of Fir Grove Elementary after the 2026–27 school year.

Intended benefits

  • Short trips to groceries, shops, fitness and recreation
  • A walkable business district that supports foot traffic
  • Less dependence on driving between neighboring destinations

Proposed phase

Feasibility/access agreements years 1–2; short links years 1–5; complex gaps later.

Proposed delivery lead

City Public Works and Parks. These are proposed responsibilities; participation would need to be agreed.

Others to involve: Property owners/operators · VA if its alternative is considered · School district · Oregon Department of Transportation · YMCA.

Dependencies

  • Creek setbacks, flood/wetland review and land rights
  • Current status of older plan projects
  • Safe driveway and arterial crossings
  • Confirmed building entrances/operators

Measures of progress

  • Continuous low-stress trips to destinations
  • Crossings completed
  • Bike parking use
  • Actual ownership/maintenance agreements

Cost allowances and scope

These early estimates are in 2026 dollars. Several projects share the same overall allowance, so the amounts below are not added together.

Connected walking and cycling program · $45–75M

Allowance over ten years

A ten-year scenario for approximately 15–25 miles of short connections and retrofits, plus 25–40 improved crossings. The mix of treatments will determine how much can be delivered.

Included across the streets and parks budgets, after accounting for completed and already funded work.

  • Major river, rail and I-5 structures require separate study and budgets.
  • No surveyed route-mile or completed engineering schedule supports this envelope yet.
Path-network maintenance provision · $0.5–1M

Annual cost once the network is established

An annual allowance for inspection, sweeping, vegetation, drainage, lighting, markings and resurfacing as the network grows.

Part of recurring operations rather than construction. It must be reconciled within the broader $15–30 million annual public and service scenario.

Growth and outdoor access

Build paths and play space with the first housing phases

Coordinate Charter Oaks connections, Diamond Lake crossings and potential Sunshine Park activities with neighborhood development.

Charter Oaks should receive connected streets, public paths and play space alongside its first housing phases. Eastside links need coordination with the Diamond Lake corridor and a review of cycling skills and nature-play opportunities at Sunshine Park. Access, maintenance and connections beyond each development boundary belong in the initial design and funding agreements.

Locations and connections

  • Diamond Lake Boulevard/Douglas Avenue/Rifle Range/Sunshine Road
  • Sunshine Park, 205 Sunshine Road
  • Charter Oaks and Troost Road development areas

Existing conditions

Sunshine Park has trails, sports fields and natural areas. A continuous protected connection from downtown has not been established in this research.

The Charter Oaks urban growth boundary changes provide a planning context. Later approvals, utilities, annexation where needed and public-path arrangements remain separate steps.

Proposed actions

  1. Coordinate neighborhood feeders and safe east–west crossings with OR 138E planning and the actual housing/service pattern.
  2. Test a pump track, beginner cycling skills area and nature play at Sunshine through the park process while retaining sports functions and protecting sensitive areas.
  3. Require connected streets, lawful public paths, a park/play route and safe crossings with each Charter Oaks housing phase.
  4. Design five-to-ten-minute walking routes along actual streets and lawful public paths, checking every crossing and barrier between home and the destination.
  5. Make the first homes work with approved access; any future river bridge would be considered separately.

Intended benefits

  • Family neighborhoods with practical outdoor access
  • Better use of an existing regional park
  • Less expensive retrofitting of disconnected subdivisions

Proposed phase

With housing/service approvals; targeted eastside links years 2–10.

Proposed delivery lead

City Community Development/Public Works with developers and relevant road/service authorities. These are proposed responsibilities; participation would need to be agreed.

Others to involve: Parks staff · Oregon Department of Transportation · County · Utilities · School district · Affected owners.

Dependencies

  • Housing entitlements and utilities
  • Safe OR 138 access and crossing review
  • Public dedication/maintenance agreements
  • Park footprint and environmental constraints

Measures of progress

  • Occupied homes connected to real destinations
  • Accessible route continuity
  • Safe crossings built with housing
  • Park access across age groups

Cost allowances and scope

These early estimates are in 2026 dollars. Several projects share the same overall allowance, so the amounts below are not added together.

Connected walking and cycling program · $45–75M

Allowance over ten years

A ten-year scenario for approximately 15–25 miles of short connections and retrofits, plus 25–40 improved crossings. The mix of treatments will determine how much can be delivered.

Included across the streets and parks budgets, after accounting for completed and already funded work.

  • Major river, rail and I-5 structures require separate study and budgets.
  • No surveyed route-mile or completed engineering schedule supports this envelope yet.
Sunshine Park cycling skills/nature-play package · $1.5–3.5M

Initial cycling-skills and nature-play improvements

An initial allowance for cycling skills and nature-play facilities at Sunshine Park, subject to park planning and site conditions.

Included in the parks budget; the road approach would be counted separately within the walking and cycling program.

Parks, trails and bounded family recreation · $50–100M

Allowance over twenty years

A preliminary twenty-year allowance for selected parks, trails, play spaces and community recreation. Each project needs its own design and operating plan.

Play areas and a discovery studio would be selected within this amount. The gym and large family center are counted in commercial development.

Connected communities

Complete local walking loops in Green and Winston

Connect schools, grocery services and parks through the agencies already responsible for local roads and public spaces.

The Green and Winston program would identify routes shared by school trips, grocery errands and park visits. Sidewalk gaps and difficult crossings are the first candidates for investment. Existing road and park agencies can coordinate that work through service agreements while any separate boundary questions are evaluated.

Locations and connections

  • Green: Carnes–Cannon–Austin/Happy Valley/Poteet approaches
  • Green and Sunnyslope elementary schools
  • Happy Valley Park, 100 Poteet Avenue
  • Winston: Lookingglass/Cary/Tumlin/Elwood
  • Thompson at Gregory/Darrell; Riverbend Park
  • Lookingglass–Abraham–Thompson–Winston Section–Grape/Community Park

Existing conditions

Douglas County has documented completed Carnes frontage work near Green Elementary. New spending should address the remaining gaps.

Winston’s Safe Routes to School plan documents a grant for the McGovern area; its current completion status needs confirmation. Happy Valley, Riverbend and Community Park are existing destinations around which further connections can be planned.

Proposed actions

  1. Close school/shop/park sidewalk gaps and prioritize crossing treatments on the actual roads people use.
  2. Verify and finish already-funded McGovern work before defining additional Winston scope.
  3. Focus Thompson crossings and Riverbend access, then connect to Community Park through the town loop.
  4. Test a $1–3M local play/access package where a current park-access audit shows need.
  5. Create County/City agreements naming the owner of each link and recurring maintenance.

Intended benefits

  • Useful family routes close to home
  • Fair recognition of unincorporated residents
  • More independent local trips for young and older residents

Proposed phase

Audit/repairs year 1; awarded work and gaps years 1–5.

Proposed delivery lead

Douglas County for Green road/park scope; City of Winston for City scope, subject to road jurisdiction. These are proposed responsibilities; participation would need to be agreed.

Others to involve: School districts · County Parks · ODOT at state highways · Residents/businesses · Transit district.

Dependencies

  • Current grant/as-built records
  • OR 42/Main crossing feasibility in Winston
  • Public rights and park entrances
  • Funding and service agreements

Measures of progress

  • Continuous school-to-shop/park trips
  • Completion of previously funded work
  • Accessible crossings
  • Local maintenance response

Cost allowances and scope

These early estimates are in 2026 dollars. Several projects share the same overall allowance, so the amounts below are not added together.

Connected walking and cycling program · $45–75M

Allowance over ten years

A ten-year scenario for approximately 15–25 miles of short connections and retrofits, plus 25–40 improved crossings. The mix of treatments will determine how much can be delivered.

Included across the streets and parks budgets, after accounting for completed and already funded work.

  • Major river, rail and I-5 structures require separate study and budgets.
  • No surveyed route-mile or completed engineering schedule supports this envelope yet.
A targeted local play/access package · $1–3M

One selected local play and access project

An allowance for one defined local play and access improvement in Green, Winston or Myrtle Creek/Tri-City, selected according to current need.

A selected project within the parks budget; this amount is not automatically allocated to every community.

  • Major road links excluded.
  • The amount applies to a selected package, rather than an allocation for every town.
Path-network maintenance provision · $0.5–1M

Annual cost once the network is established

An annual allowance for inspection, sweeping, vegetation, drainage, lighting, markings and resurfacing as the network grows.

Part of recurring operations rather than construction. It must be reconciled within the broader $15–30 million annual public and service scenario.

Connected communities

Improve approaches to Sutherlin and Oakland recreation routes

Connect neighborhoods and schools to Red Rock Trail, Ford’s Pond and local town-center loops.

Sutherlin’s Red Rock Trail and Ford’s Pond are starting destinations for a more accessible local network. In Oakland, compact streets provide the basis for a loop through the town center. The first phase should address approaches and crossings; longer connections require separate engineering and land-access review.

Locations and connections

  • Red Rock Trail: South State–Festival Grounds–Nicholas Court
  • Central Avenue at Mardonna and Grant–Kruse
  • West Sixth/East Fourth and Hartley Park
  • Church/Fort McKay/Plat M/West Duke approaches to Ford’s Pond
  • Oakland Fifth/Oak/Locust and Fifth toward Maple

Existing conditions

Sutherlin identifies an existing paved Red Rock Trail of approximately 1.3 miles and completed perimeter-path and amenity work at Ford’s Pond.

Central Avenue crossings were programmed for fall 2026, and Oakland’s earlier plan described Cypress work as funded or underway. A current review would establish what is complete and which gaps remain.

Proposed actions

  1. Connect Red Rock’s existing ends and neighborhood approaches to Central shops and civic destinations.
  2. Finish verified school/Hartley Park and Central-crossing gaps without rebudgeting completed work.
  3. Improve existing-road approaches to Ford’s Pond first.
  4. Treat I-5/Ford’s Pond, Red Rock–Cooper Creek and Oakland’s Ash Creek concepts as later rights/engineering studies.
  5. Upgrade Fifth/Oak and Fifth/Locust accessibility and sidewalk continuity toward Maple.

Intended benefits

  • More value from facilities already built
  • Safer daily trips as well as recreation
  • A practical sequence before expensive regional structures

Proposed phase

Audit and short gaps years 1–3; network extensions years 3–7; structures only after feasibility.

Proposed delivery lead

Cities of Sutherlin and Oakland for their jurisdictions. These are proposed responsibilities; participation would need to be agreed.

Others to involve: School districts · County/ODOT road owners · Park users · Affected landowners.

Dependencies

  • Current as-builts and crossing status
  • Right-of-way and creek/I-5 permissions
  • Road authority design standards
  • Maintenance owners

Measures of progress

  • Usable connections to existing trails
  • School/park crossing completion
  • Accessible entrances
  • No duplication of funded projects

Cost allowances and scope

These early estimates are in 2026 dollars. Several projects share the same overall allowance, so the amounts below are not added together.

Connected walking and cycling program · $45–75M

Allowance over ten years

A ten-year scenario for approximately 15–25 miles of short connections and retrofits, plus 25–40 improved crossings. The mix of treatments will determine how much can be delivered.

Included across the streets and parks budgets, after accounting for completed and already funded work.

  • Major river, rail and I-5 structures require separate study and budgets.
  • No surveyed route-mile or completed engineering schedule supports this envelope yet.
Parks, trails and bounded family recreation · $50–100M

Allowance over twenty years

A preliminary twenty-year allowance for selected parks, trails, play spaces and community recreation. Each project needs its own design and operating plan.

Play areas and a discovery studio would be selected within this amount. The gym and large family center are counted in commercial development.

Path-network maintenance provision · $0.5–1M

Annual cost once the network is established

An annual allowance for inspection, sweeping, vegetation, drainage, lighting, markings and resurfacing as the network grows.

Part of recurring operations rather than construction. It must be reconciled within the broader $15–30 million annual public and service scenario.

Connected communities

Connect schools, parks and town centers in Drain and Yoncalla

Build locally selected route packages around Anna Drain Park and Yoncalla’s school and Main Street connections.

Drain and Yoncalla are included as places for local investment within the regional proposal. In Drain, street and rail-crossing work should be coordinated with the Anna Drain Park project. In Yoncalla, the initial assessment covers the First–Birch–Fifth school route and Main Street connections. Each town should select the first gaps to address.

Locations and connections

  • Drain: East B school approaches and rail crossing
  • Moreland rail undercrossing and high-school approach
  • First Street from B to Pass Creek Bridge
  • Moreland/Anna Drain Park Road
  • Yoncalla: First–Birch–Fifth school route
  • Main Street community center and Williams Road park approach

Existing conditions

Drain’s Safe Routes to School plan identifies school routes and rail crossings that need attention. Anna Drain Park also has an improvement program, with the research identifying grants of $996,415 from Oregon Parks and Recreation and $50,000 from the Ford Foundation. New work should fit the projects actually being delivered.

Yoncalla’s school campuses and community center at 400 Main Street are identified destinations. The public entrance and approach to the Williams Road park still need local confirmation.

Proposed actions

  1. Integrate Anna Drain Park work into a safe public-street circuit, with rail/undercrossing safety reviewed by the authorities.
  2. Prioritize East B and First/Moreland gaps used on everyday school trips.
  3. Audit the full Yoncalla First–Birch–Fifth route, Main Street crossings and accessible park approach.
  4. Use clear wayfinding and small rest/play stops at approved public locations.
  5. Confirm the current status of the Pass Creek covered bridge before including it in a public walking route.

Intended benefits

  • Visible investment in northern communities
  • Useful routes for school-age children and families
  • A stronger connection between parks and local businesses

Proposed phase

Coordinate funded work now; short links and crossing packages years 1–5.

Proposed delivery lead

Cities of Drain and Yoncalla with the relevant road owners. These are proposed responsibilities; participation would need to be agreed.

Others to involve: School districts · ODOT/CORP where applicable · County · Park project teams · Local residents.

Dependencies

  • Current park and bridge status
  • Rail/undercrossing authorizations
  • Verified park entrances and public access
  • Capital and maintenance funding

Measures of progress

  • Safe complete school/park trips
  • Existing grants delivered
  • Verified bridge/park information
  • Accessibility and maintenance condition

Cost allowances and scope

These early estimates are in 2026 dollars. Several projects share the same overall allowance, so the amounts below are not added together.

Connected walking and cycling program · $45–75M

Allowance over ten years

A ten-year scenario for approximately 15–25 miles of short connections and retrofits, plus 25–40 improved crossings. The mix of treatments will determine how much can be delivered.

Included across the streets and parks budgets, after accounting for completed and already funded work.

  • Major river, rail and I-5 structures require separate study and budgets.
  • No surveyed route-mile or completed engineering schedule supports this envelope yet.
Parks, trails and bounded family recreation · $50–100M

Allowance over twenty years

A preliminary twenty-year allowance for selected parks, trails, play spaces and community recreation. Each project needs its own design and operating plan.

Play areas and a discovery studio would be selected within this amount. The gym and large family center are counted in commercial development.

Path-network maintenance provision · $0.5–1M

Annual cost once the network is established

An annual allowance for inspection, sweeping, vegetation, drainage, lighting, markings and resurfacing as the network grows.

Part of recurring operations rather than construction. It must be reconciled within the broader $15–30 million annual public and service scenario.

Connected communities

Complete school and park connections in Myrtle Creek and Tri-City

Prioritize Myrtle Creek school crossings, Millsite and Evergreen parks, and Chadwick’s link to Old Pacific services.

This route package starts with the streets residents already use between school, shops and parks. The work includes continuous sidewalks and safer crossings in Myrtle Creek, plus the connection between Chadwick and Old Pacific services in Tri-City. Proposed neighborhood play space should follow a current inventory of facilities and access gaps.

Locations and connections

  • Myrtle Creek: Rice/Spruce and Division/Spruce
  • Division/Myrtle Road freight interface
  • Johnson/Spruce/Neal neighborhood gaps
  • Maple/Cedar/Oak, Main, Fourth and Volunteer routes
  • Evergreen Park and Millsite Park, 231 Volunteer Way
  • Tri-City: Chadwick school approach and Old Pacific services corridor

Existing conditions

The Safe Routes to School plan identifies crossing and freight conflicts around the schools and Division corridor. A field review would show what has changed since that plan.

Evergreen and Millsite are established parks, but a continuous separated connection between them has not been verified. An older plan identified a Tri-City park shortfall; a current inventory is needed before deciding whether a new site is warranted.

Proposed actions

  1. Prioritize the named school crossings and Division/Myrtle Road truck-turn conflicts.
  2. Close Johnson/Spruce/Neal and other verified neighborhood gaps into the public-street park network.
  3. Connect Chadwick school access with everyday services on Old Pacific through a properly designed crossing/sidewalk package.
  4. Pair housing with a need-tested neighborhood play site after checking existing parks and public access.
  5. Use a targeted $1–3M play package only if the audit supports it; price road links through the active program.

Intended benefits

  • Safer school trips
  • More local family activity
  • A stronger neighborhood network around housing and services

Proposed phase

Audit/design year 1; priority gaps years 1–5; extensions years 3–7.

Proposed delivery lead

City of Myrtle Creek and Douglas County for Tri-City, according to road/park jurisdiction. These are proposed responsibilities; participation would need to be agreed.

Others to involve: South Umpqua School District · Oregon Department of Transportation · Residents · Freight/business operators.

Dependencies

  • Freight and crossing design
  • Current park/entrance inventory
  • Road rights and service approvals
  • Maintenance and program funding

Measures of progress

  • Reduced difficult crossing gaps
  • School/service route continuity
  • Park access by actual walking route
  • Field-verified project status

Cost allowances and scope

These early estimates are in 2026 dollars. Several projects share the same overall allowance, so the amounts below are not added together.

Connected walking and cycling program · $45–75M

Allowance over ten years

A ten-year scenario for approximately 15–25 miles of short connections and retrofits, plus 25–40 improved crossings. The mix of treatments will determine how much can be delivered.

Included across the streets and parks budgets, after accounting for completed and already funded work.

  • Major river, rail and I-5 structures require separate study and budgets.
  • No surveyed route-mile or completed engineering schedule supports this envelope yet.
A targeted local play/access package · $1–3M

One selected local play and access project

An allowance for one defined local play and access improvement in Green, Winston or Myrtle Creek/Tri-City, selected according to current need.

A selected project within the parks budget; this amount is not automatically allocated to every community.

  • Major road links excluded.
  • The amount applies to a selected package, rather than an allocation for every town.
Path-network maintenance provision · $0.5–1M

Annual cost once the network is established

An annual allowance for inspection, sweeping, vegetation, drainage, lighting, markings and resurfacing as the network grows.

Part of recurring operations rather than construction. It must be reconciled within the broader $15–30 million annual public and service scenario.

Connected communities

Connect Riddle and Canyonville’s existing destinations

Address gaps between schools, shops, community facilities and parks while maintaining completed improvements.

Riddle’s schools, shops, park and community center provide destinations for a local walking circuit. Canyonville’s completed Main Street investment offers a starting point for links toward downtown and Pioneer Park. A potential Stanton Park route needs its own bridge, crossing and road-safety assessment before it is promoted as usable.

Locations and connections

  • Riddle: Main, Park, First, Fifth and Parkside
  • Riddle school campuses and community center at 123 Parkside
  • Canyonville North Main–downtown–Pioneer Park at Fourth/Canyon
  • Separate Gazley Bridge/Stanton Park approach study

Existing conditions

Riddle’s schools and community center provide established destinations for a local route. Park entrances and accessibility need a current review.

County Public Works reported completion of Canyonville’s 0.65-mile Main Street project on January 26, 2026, with a $3,306,114 construction contract. That completed work is a starting point for further links.

Stanton Park rehabilitation was reported complete in September 2026. A comfortable route from town is a separate project to assess.

Proposed actions

  1. Create a clearly marked, accessible Riddle circuit with low-speed crossings and sidewalk continuity.
  2. Extend the value of Canyonville’s completed Main corridor toward downtown and Pioneer Park.
  3. Check Pioneer Park’s footbridge, seasonal restroom availability and accessible entrances.
  4. Assess the Gazley Bridge and Stanton approaches separately to establish whether a comfortable family walking and cycling route is feasible.
  5. Fund maintenance and practical local programming before proposing another large new facility.

Intended benefits

  • More benefit from completed public investment
  • Compact daily outdoor routes
  • A clear, manageable list of remaining gaps

Proposed phase

Audit and repair now; short connections years 1–5; Stanton connection only after study.

Proposed delivery lead

Cities of Riddle and Canyonville, with County/ODOT for their facilities. These are proposed responsibilities; participation would need to be agreed.

Others to involve: School districts · County Parks/Public Works · Community-center operators · Families and accessibility advisers.

Dependencies

  • Current entrance/bridge/access checks
  • Completed-project reconciliation
  • Road jurisdiction
  • Operating and maintenance commitments

Measures of progress

  • Complete accessible local circuits
  • Existing infrastructure kept usable
  • Repair response
  • No duplicate capital budgeting

Cost allowances and scope

These early estimates are in 2026 dollars. Several projects share the same overall allowance, so the amounts below are not added together.

Connected walking and cycling program · $45–75M

Allowance over ten years

A ten-year scenario for approximately 15–25 miles of short connections and retrofits, plus 25–40 improved crossings. The mix of treatments will determine how much can be delivered.

Included across the streets and parks budgets, after accounting for completed and already funded work.

  • Major river, rail and I-5 structures require separate study and budgets.
  • No surveyed route-mile or completed engineering schedule supports this envelope yet.
Parks, trails and bounded family recreation · $50–100M

Allowance over twenty years

A preliminary twenty-year allowance for selected parks, trails, play spaces and community recreation. Each project needs its own design and operating plan.

Play areas and a discovery studio would be selected within this amount. The gym and large family center are counted in commercial development.

Path-network maintenance provision · $0.5–1M

Annual cost once the network is established

An annual allowance for inspection, sweeping, vegetation, drainage, lighting, markings and resurfacing as the network grows.

Part of recurring operations rather than construction. It must be reconciled within the broader $15–30 million annual public and service scenario.

Family life and regional parks

Expand free, affordable and paid family activities

Combine park access and recurring youth programs with operator-led attractions that add a distinct local offer.

The recreation program should serve households at several price points. Better park access, recurring outdoor events, youth activities and a downtown discovery studio sit alongside the major commercial attractions. Existing facilities belong in the delivery plan. New programs need capable operators, suitable premises and funding for continued operation.

Locations and connections

  • River Forks County Park, 380 River Forks Park Road
  • Melrose/Garden Valley public-road approaches
  • Downtown Jackson/Main area for a discovery-studio search
  • Stewart/YMCA/UCC/school facilities for shared-use review
  • Partner-town centers and parks

Existing conditions

River Forks is an existing County park with play, trails and river access. This research has not verified a continuous riverbank trail from downtown Roseburg to the park.

The YMCA, schools and other recreation providers already offer facilities that could support more shared use or programming. The premium gym and large family center have separate business cases and are counted in the commercial development budget.

Proposed actions

  1. Improve River Forks entrance/access first, then study a comfortable regional approach on actual road corridors.
  2. Find a suitable 12,000–18,000 sq ft downtown building for a children’s discovery/maker/rainy-day studio with a capable operator and staff budget.
  3. Review shared-use capacity before spending $2–5M on selected youth sports, accessible courts and clinics.
  4. Create a dependable regional calendar of affordable/free outdoor markets, family movie nights, youth sessions and seasonal events.
  5. Test major waterpark, tournament campus or large go-kart ambitions separately after paid demand, utilities, insurance and renewal costs are demonstrated.

Intended benefits

  • Year-round family choices
  • More foot traffic for existing businesses
  • Free/affordable access alongside paid attractions
  • Better use of regional assets

Proposed phase

Programming and site/operator work year 1; bounded upgrades years 1–5; larger independent concepts later.

Proposed delivery lead

Participating cities/County Parks and an accountable operator for each program. These are proposed responsibilities; participation would need to be agreed.

Others to involve: Schools and Umpqua Community College · Existing recreation providers · Downtown owners · Nonprofits · Sponsors · Residents.

Dependencies

  • Operating leadership and permanent staffing
  • Building/park permissions and feasible conversion
  • Demand, pricing and access testing
  • Public rights for regional trail approaches

Measures of progress

  • Affordable/free participation
  • Reliable opening hours
  • Operator financial sustainability
  • Local business spillover
  • Accessible family options

Cost allowances and scope

These early estimates are in 2026 dollars. Several projects share the same overall allowance, so the amounts below are not added together.

Parks, trails and bounded family recreation · $50–100M

Allowance over twenty years

A preliminary twenty-year allowance for selected parks, trails, play spaces and community recreation. Each project needs its own design and operating plan.

Play areas and a discovery studio would be selected within this amount. The gym and large family center are counted in commercial development.

Downtown discovery and maker studio · $3–7M

Conversion and launch of a 12,000–18,000-square-foot space

An initial allowance to fit out and launch a 12,000–18,000-square-foot discovery and maker studio in a suitable building.

A possible allocation within the parks and recreation budget, subject to a building, operator and funding decision.

  • Property purchase excluded.
  • Operator, ongoing staff and renewal budget required.
Bounded youth sport and accessible-court upgrades · $2–5M

Selected upgrades for shared use

An allowance for selected shared-use improvements following a review of Stewart, YMCA, Umpqua Community College and school facilities.

Included in the parks and recreation budget. A new tournament complex would need a separate demand and operating case.

Free and affordable regional family programming · $0.4–0.8M

Annual cost of a regional event schedule

An annual assumption for a regional calendar of markets, family movie evenings and recurring affordable events.

Included in recurring services, separately from construction spending.

Design and delivery

Fund complete routes and their ongoing maintenance

Prioritize usable connections, verify accessibility and assign maintenance responsibility before construction.

A completed segment has limited value if the next crossing or missing link prevents the trip. The program should select connections that reach a school, park or shop, inspect accessibility and resolve access rights. Each project needs a maintenance owner and an operating allowance for repairs, cleaning and vegetation work.

Locations and connections

  • All 25 named school/park/shop route packages
  • Busy arterial crossings
  • New housing/business frontages
  • Existing public parks and paths

Existing conditions

The research identifies 25 connections to investigate across the region. Some build on existing paths or published plans; others need an initial local assessment. They are not 25 approved construction projects.

Agency design guidance helps determine path width and crossing protection according to use, traffic speed and volume. Future grant opportunities must be checked when projects are ready to apply: the research noted that the next Oregon Community Paths competition was on hold and Safe Routes to School construction applications were anticipated in spring 2027 for 2028 awards.

Proposed actions

  1. In the first year, compare published plans with what is built today, review land ownership, traffic and accessibility, and choose ten gaps whose repair would complete useful trips.
  2. Where suitable, provide shared paths 10–12 feet wide, comfortable sidewalks, separation from traffic and accessible ramps, designed to the responsible agency’s standards.
  3. At busy multilane crossings evaluate visibility, lighting, refuge, speed, turn conflicts and suitable beacons/signals rather than relying on paint alone.
  4. Aim to complete roughly 5–8 miles of useful connections and 12–20 crossings in the first three years, with the final selection based on design, cost and available funding.
  5. Give each asset an owner, inspection/sweeping/drainage/vegetation schedule, repair standard and renewal reserve before opening it.
  6. Work with Thrive Umpqua/Douglas ESD’s existing education effort and publish actual use, route continuity and maintenance results.

Intended benefits

  • Routes that families can actually complete
  • Long-term protection of capital investment
  • Transparent priorities and consistent public experience

Proposed phase

Standards and ten-gap priority list in year 1; connected phases years 1–10; permanent care throughout.

Proposed delivery lead

Each road/park asset owner, coordinated through the proposed regional delivery compact. These are proposed responsibilities; participation would need to be agreed.

Others to involve: City/County/partner towns · Oregon Department of Transportation · Schools · Thrive Umpqua and Douglas Education Service District · Access advisers · Public works crews.

Dependencies

  • Engineering design and agency approvals
  • Agreed public rights wherever a connection involves private, creek, railway or utility land
  • Funding for maintenance before a route opens
  • An actual funding award or another committed source before construction

Measures of progress

  • Complete useful trips rather than mileage alone
  • Actual traffic speeds
  • Repair-response time
  • Accessible crossing coverage
  • Participation and use

Cost allowances and scope

These early estimates are in 2026 dollars. Several projects share the same overall allowance, so the amounts below are not added together.

Connected walking and cycling program · $45–75M

Allowance over ten years

A ten-year scenario for approximately 15–25 miles of short connections and retrofits, plus 25–40 improved crossings. The mix of treatments will determine how much can be delivered.

Included across the streets and parks budgets, after accounting for completed and already funded work.

  • Major river, rail and I-5 structures require separate study and budgets.
  • No surveyed route-mile or completed engineering schedule supports this envelope yet.
Path-network maintenance provision · $0.5–1M

Annual cost once the network is established

An annual allowance for inspection, sweeping, vegetation, drainage, lighting, markings and resurfacing as the network grows.

Part of recurring operations rather than construction. It must be reconciled within the broader $15–30 million annual public and service scenario.

Parks, trails and bounded family recreation · $50–100M

Allowance over twenty years

A preliminary twenty-year allowance for selected parks, trails, play spaces and community recreation. Each project needs its own design and operating plan.

Play areas and a discovery studio would be selected within this amount. The gym and large family center are counted in commercial development.

REINVEST IN EXISTING SPORTS PARKS

Upgrade the places
our teams already play.

The sports proposal pairs better playing surfaces with the facilities that make practices and game days work: reliable restrooms, shade, accessible seating and safe arrival routes. These three illustrations show the standard to work toward.

PROPOSED SPORTS FACILITY RENEWAL

Micelli Park softball and riverfront

Illustrative Micelli Park renewal with a single softball field, modest covered seating, improved restrooms and accessible paths in a small urban riverfront setting.

An AI-generated illustration of the proposed standard for fields and public facilities. It does not show the park’s exact existing layout, surveyed conditions or an approved design. The project scope requires site assessment, operator input and public review.

Micelli Park softball and riverfront

Find the existing park

Make Micelli Park a priority for renewal. Restore the softball field and drainage, upgrade restrooms and add shaded seating. Connect the facilities with accessible paths and a clear, maintained route through the riverfront park.

  • Softball field, drainage and fencing
  • Restrooms, water and shaded seating
  • Accessible paths and family amenities
  • Shielded lighting where approved
Existing facilities and source

The City’s park inventory describes approximately six acres along the South Umpqua River at 1498 SE Micelli Street, with a softball field, restrooms, open lawn, paved parking and access to Happy Tails Dog Park.

City park inventory

PROPOSED SPORTS FACILITY RENEWAL

Fir Grove soccer fields and sidelines

Illustrative Fir Grove soccer-field improvements with a coherent playing field, shaded sideline seating, accessible paths and a modest restroom and service building.

An AI-generated illustration of the proposed standard for fields and public facilities. It does not show the park’s exact existing layout, surveyed conditions or an approved design. The project scope requires site assessment, operator input and public review.

Fir Grove soccer fields and sidelines

Find the existing park

Improve field condition and the experience around the sidelines. A clear arrival route, accessible viewing areas, team shelters and convenient restrooms would serve players, caregivers and tournament visitors.

  • Surface and drainage improvements
  • Team shelters and shaded viewing
  • Restrooms and water refill points
  • Safer drop-off and path connections
Existing facilities and source

The Fir Grove section of Stewart Park already includes soccer fields, restrooms, parking and walking trails beside the river.

City park inventory

PROPOSED SPORTS FACILITY RENEWAL

Stewart Park and Legion baseball facilities

Illustrative Stewart Park ballpark renewal with a maintained baseball diamond, modest covered stands, accessible spectator circulation and improved concessions.

An AI-generated illustration of the proposed standard for fields and public facilities. It does not show the park’s exact existing layout, surveyed conditions or an approved design. The project scope requires site assessment, operator input and public review.

Stewart Park and Legion baseball facilities

Find the existing park

Retain the community ballpark character while improving seating, accessible routes, player facilities and concessions. Coordinate the work with existing operators so construction and maintenance fit the playing calendar.

  • Field and player-facility repairs
  • Covered seating and clear sightlines
  • Accessible restrooms and concessions
  • Lighting, signs and arrival improvements
Existing facilities and source

Stewart Park’s established recreation facilities include ballfields and Roseburg American Legion Baseball, with paths and other park activities nearby.

City park inventory

KEEP THE IMPROVEMENTS IN GOOD CONDITION

Fund the upkeep with the work.

Start with a joint condition assessment by parks staff, leagues and facility operators. Rank drainage, safety, accessibility and restroom needs first. Each approved phase should include construction costs, annual maintenance, replacement reserves and a schedule that protects community use.

Build on investment already made.

Umpqua Valley Tennis Center reports that its outdoor court improvements were completed in 2026, including lighting, fencing, seating and entry access. The wider sports plan should coordinate with those improvements and direct new work to documented remaining needs.

Read the tennis center’s facility update

AI-generated renewal concepts, not photographs of current conditions or approved designs. Exact layouts, field surfaces, lighting, drainage and any work near waterways require site assessment and public review. Sources reviewed November 9, 2026.

Find the proposed walking and cycling connections in your community

The 25 route packages connect neighborhoods, schools, parks and services across the region. Some build on existing paths; others follow published plans or identify gaps for local study. Each entry identifies the connection, its source status and unresolved access conditions.

Timings are proposed periods after the work is funded. These descriptions are planning ideas, not directions for a currently continuous or protected route.

Roseburg · Proposed timing: 0–3 years

The river parks, joined up

A family outing could move easily between Stewart, River Front, Gaddis and Fir Grove parks, with clear entrances from surrounding neighborhoods and businesses. The priority is to repair and complete short links, improve crossings and make the existing network easier to use.

Places along the connection: Stewart Park · River Front Park · Gaddis Park · Fir Grove Park

Where it stands: Existing paths and parks; access and maintenance improvements proposed.

New work would fit the City’s current Stewart, Gaddis and greenway planning. The immediate focus is on the missing connections and care that make existing places more useful.

Roseburg · Proposed timing: 1–5 years

Newton Creek: neighborhoods to the YMCA and Stewart

The Newton Creek concepts could give nearby households a more comfortable route to Hucrest, the YMCA, Charles Gardiner Park and the Stewart shopping district. The proposal focuses on the short missing links between existing sections, beginning with ownership and engineering review.

Places along the connection: Hucrest Elementary, 1810 NW Kline · YMCA/Harvey · Charles Gardiner Park

Where it stands: Published path concepts; current completion and access rights need confirmation.

Creek setbacks, wetlands, crossings and ownership will determine the route. Any section on private land would need an agreed public right of access.

Roseburg · Proposed timing: 1–5 years

Garden Valley: Duck Pond to shopping and fitness

A continuous connection from Duck Pond and the I-5 path toward Garden Valley businesses could turn a workout and an errand into one walking or cycling trip. Driveway crossings and secure bicycle parking at business entrances are essential parts of the proposal.

Where it stands: Connection identified in transportation planning; design and agreements remain.

The public-road option would be compared with an alternative involving the Veterans Affairs campus, which would require agreement. Any connection to the proposed gym also depends on the business and property arrangements.

Roseburg · Proposed timing: 1–7 years

Harvard, Fir Grove and Stewart

This proposal would improve walking and cycling along Harvard and separately address the south-bank gap between Fir Grove and Stewart. The goal is to connect neighborhood homes, shops and park entrances while giving particular attention to turning traffic at crossings.

Where it stands: Existing park connections with additional links proposed.

The school district plans to close Fir Grove Elementary after 2026–27; the park remains a destination for this proposal. Any riverbank connection would need to respect private ownership and floodplain requirements.

Roseburg · Proposed timing: 0–5 years

Downtown to Micelli and Templin parks

A park visit and a meal downtown should feel like parts of the same outing. Calmer streets, better crossings and clearer transitions between existing paths and streets could make the connections to Micelli and Templin more comfortable for families.

Where it stands: Existing parks and a mixture of paths and streets; improvements proposed.

Parts of the trip would remain on streets rather than a separate river trail. Changes at the railway would require approval from the railroad and the responsible transportation authorities.

Roseburg · Proposed timing: 2–10 years

East Roseburg to Sunshine Park

The long-term aim is a comfortable route between eastside homes, daily services and Sunshine Park. Work would begin with the neighborhood links and crossings people need most, coordinated with planning for OR 138, then extend toward the park as suitable sections become feasible.

Where it stands: Existing park; a continuous protected connection remains to be studied.

Traffic speeds, driveway movements, slopes, creek and floodplain conditions, and road jurisdiction will influence the final route.

Roseburg fringe · Proposed timing: With housing phases

Charter Oaks: connected from the first homes

New housing in Charter Oaks should include a connected street and path network, a nearby play space and safe access to daily destinations. Each approved phase would connect to existing roads and preserve useful future links so families are not left waiting for a later development to make the neighborhood work.

Where it stands: A proposed standard for new development; no specific path alignment selected.

Land inside the urban growth boundary still needs the relevant approvals, utilities and public-path arrangements. The first homes should work without relying on an unapproved river bridge.

Roseburg fringe · Proposed timing: 3–10+ years

A better approach to River Forks

River Forks could be easier to reach and enjoy, beginning with its entrance and nearby walking access. A longer, separated regional approach deserves study along actual road corridors, with traffic, bridge conditions and land rights assessed before a route is selected.

Where it stands: Existing County park; a regional connection is a longer-term study.

No continuous Roseburg-to-River Forks riverbank path has been verified. A route intended for families would need more protection than an ordinary rural road shoulder.

Green · Proposed timing: 0–5 years

Green: schools, shops and Happy Valley Park

Green’s neighborhood network would connect homes and both elementary schools to daily shopping and Happy Valley Park. The first improvements would close sidewalk gaps and address crossings, building on the Carnes school frontage already completed.

Places along the connection: Green Elementary, 4498 SW Carnes · Sunnyslope Elementary, 2230 SW Cannon · Happy Valley Park, 100 Poteet

Where it stands: Existing road improvements, with remaining connections to assess.

Douglas County would lead work on its roads in unincorporated Green. Park approaches need their own review, and the project does not depend on annexation.

Winston · Proposed timing: 0–3 years

Winston: McGovern and Lookingglass

The McGovern-area school-route investment can become the foundation for a wider neighborhood network. After confirming what the existing grant delivered, the proposal would close the remaining links toward shops and the town loop, including the Lookingglass crossings at Cary, Brockway and Abraham.

Where it stands: A 2023 Safe Routes to School grant is documented; current completion needs confirmation.

The first review would distinguish completed and funded work from genuinely new improvements, so the same project is not paid for twice.

Winston · Proposed timing: 1–5 years

Winston: schools, Riverbend and Community Park

Safer Thompson crossings at Gregory and Darrell could help join schools with Riverbend Park. Connections through calmer neighborhood streets could continue toward Community Park and the community center, creating a useful local loop for an after-school trip or family walk.

Places along the connection: Winston Middle, 330 Thompson · Riverbend Park, 223 Thompson · Community Park, 440 SE Grape

Where it stands: Existing schools and parks; additional street and crossing improvements proposed.

Crossings of OR 42 and Main Street need careful design for traffic speed and turning movements. A line on the map alone cannot make those crossings comfortable.

Sutherlin · Proposed timing: 0–3 years

Sutherlin: Red Rock to downtown

The Red Rock Trail could serve more everyday trips with clearer links from its ends and nearby neighborhoods to downtown shops, civic services and Central Park. The first phase would build on the existing paved trail and the Central Avenue crossing work.

Places along the connection: Red Rock trail, South State–Nicholas Court · Festival Grounds · Central Park

Where it stands: Approximately 1.3 miles of existing paved trail; Central crossings were programmed for fall 2026.

A current review would confirm the pedestrian-beacon work at Mardonna and between Grant and Kruse before additional improvements are defined.

Sutherlin · Proposed timing: 1–5 years

Sutherlin: schools and Hartley Park

Continuous sidewalks, calmer cycling routes and safer crossings along West Sixth and East Fourth could link homes, schools and Hartley Park. The proposal would concentrate on the gaps that prevent residents from completing those trips comfortably today.

Where it stands: Connections identified in City transportation planning and June 2026 draft park recommendations.

Any new connecting street or path across private property would require the appropriate public process and land agreement.

Sutherlin · Proposed timing: 1–8 years

Sutherlin: reach Ford’s Pond from the neighborhood

Ford’s Pond already offers a paved park loop. Better approaches from southwest neighborhoods could help more residents make it part of everyday life. A connection for neighborhoods east of I-5, potentially involving an underpass, would be evaluated as a separate and more complex project.

Where it stands: Existing park loop; additional road approaches and an I-5 connection proposed.

An I-5 connection needs engineering, drainage and utility review, land rights and the necessary approvals. This proposal does not identify an existing public underpass path.

Sutherlin · Proposed timing: 3–10 years

Sutherlin: toward Cooper Creek

A comfortable connection from the Red Rock system toward Cooper Creek Reservoir could add a longer recreation option. The first steps would improve trailhead access and useful links from homes along public roads while the feasibility of a continuous route is assessed.

Where it stands: Existing reservoir recreation trails; the connection from town remains a study.

A creekside route would require public access rights and environmental review. No off-road alignment has been selected.

Oakland · Proposed timing: 0–5 years

Oakland: schools and the town center

Accessible crossings and continuous sidewalks along Fifth could join the school campus with the Oak and Maple neighborhoods and downtown. A compact route on existing public streets would help make school, local errands and a walk around town easier to combine.

Where it stands: Existing school facilities and earlier route recommendations; current construction status needs review.

Cypress work was described as funded or underway in 2020 and should be checked first. A possible Ash Creek path from First to Eighth is a separate longer-term study.

Drain · Proposed timing: 0–3 years

Drain: school to downtown on East A and B

The proposal would improve East B sidewalks, rail-crossing access and school crossings so the elementary and middle school have a more comfortable connection to downtown services. The named gaps provide a practical starting point for a first phase.

Places along the connection: North Douglas Elementary/Middle, 100 N School

Where it stands: Priorities identified in the April 2025 Safe Routes to School plan; delivery status needs confirmation.

Changes at the railway require rail-authority review. The route concerns the East A and East B streets serving this school and downtown area.

Drain · Proposed timing: 0–5 years

Drain: high school to Anna Drain Park

A safer route via Moreland could link the high school with Anna Drain Park and the park’s improvement and reading-walk work. The proposal includes missing sidewalks, the park-road crossing and protected passage where the route goes under the railway.

Places along the connection: North Douglas High, 305 S Main · Anna Drain Park

Where it stands: Existing destinations and park work, with route improvements proposed.

The undercrossing needs clearance and drainage assessment. The 2025 plan proposed reopening the covered bridge; its current status must be confirmed before it becomes part of a public route.

Yoncalla · Proposed timing: 0–5 years

Yoncalla: schools, Main Street and community life

First, Birch and Fifth form a starting point for a route between the elementary and secondary schools. The proposal would fill sidewalk gaps, calm traffic and improve connections toward Main Street services and the community center, while assessing the Williams Road park approach with its operator.

Places along the connection: Elementary, 401 First · Middle/High, 292 Fifth · Community Center, 400 Main

Where it stands: A new connection proposal using identified streets and destinations.

Park entrances and public access still need local confirmation. School grounds cannot be assumed to provide a public shortcut, and a continuous protected loop has not yet been established.

Myrtle Creek · Proposed timing: 0–5 years

Myrtle Creek: safer trips around the schools

Crossings at Rice and Spruce and at Division and Spruce would anchor a more useful neighborhood school network. Short connections along Johnson, Spruce and Neal could bring homes into that network, while the Division–Myrtle Road junction receives specific attention to freight movements.

Places along the connection: Coffenberry Middle, 591 NE Rice · Myrtle Creek Elementary

Where it stands: Priorities identified in the April 2022 Safe Routes to School plan; current delivery needs review.

Truck turns, visibility and crossing protection require engineering at Myrtle Road. The treatment needs to match the actual traffic conditions.

Myrtle Creek · Proposed timing: 1–5 years

Myrtle Creek: parks, shops and downtown

An accessible circuit could connect Millsite Park, downtown shops and Evergreen Park using existing streets and park paths. Better downtown crossings and links to the school-route network would make the trip useful for local errands as well as recreation.

Places along the connection: Millsite Park, 231 Volunteer · Evergreen Park · Downtown Main/Volunteer

Where it stands: Existing parks and streets; a more complete connection is proposed.

Evergreen’s entrance should be checked locally. A creekside path would only be included where public access is confirmed.

Tri-City · Proposed timing: 1–7 years

Tri-City: Chadwick to daily services

Safer school access along Chadwick and a protected connection toward Old Pacific services could make everyday trips easier. As housing is added, connected internal streets and a need-tested neighborhood play space could help create a stronger local center.

Places along the connection: Tri-City Elementary, 546 SW Chadwick

Where it stands: A school and public-road connection to assess, with a fresh park-access review needed.

Road jurisdiction and highway driveway conflicts need to be resolved. The older park inventory cannot establish what residents can access today.

Riddle · Proposed timing: 0–5 years

Riddle: a walk through the community

Schools, Main Street shops, City Park and the community center could form a compact route for walking and low-speed cycling. The proposal would prioritize crossings and missing sidewalks around Park and First, making the destinations easier to reach from surrounding homes.

Places along the connection: Elementary, 463 Park · Junior/Senior High, 147 Main · Community Center, 123 Parkside · Riddle City Park

Where it stands: Existing destinations; a local street and access assessment is proposed.

Park entrances and accessibility need confirmation. Any freight street requires a treatment suited to its traffic, and no private cut-through is assumed.

Canyonville · Proposed timing: 0–5 years

Canyonville: Main Street to Pioneer Park

The completed North Main school-route work gives Canyonville a strong starting point. Filling the remaining downtown-to-Pioneer Park sidewalk and crossing gaps could extend its value, while maintaining the new infrastructure and its connections to school, civic uses and businesses.

Places along the connection: Canyonville School, North Main · Pioneer Park, East Fourth/Canyon

Where it stands: North Main work reported complete in the 2026 acceptance record; further links proposed.

The creek footbridge and the actual park entrance need an accessibility check. Completed Main Street improvements are not new construction costs in this proposal.

Canyonville fringe · Proposed timing: 3–10 years

Canyonville: a comfortable route to Stanton Park

Stanton Park’s improvements create a reason to examine better access from nearby homes and North Main. The study would focus on road approaches and crossings first, then determine whether families could reach the park on a suitably protected route.

Where it stands: Existing improved County park; the connection remains a study.

I-5, river and road crossings need specific assessment. No new bridge or guaranteed family cycling route has been selected.

CONNECTIVITY THAT MATCHES REAL DEMAND

Match airport investment to demonstrable demand.

The airport program first evaluates improvements at the existing facility. Hangars, aviation businesses, infrastructure changes and scheduled passenger service have different customers and funding requirements. Each needs its own demand assessment before the region commits to expansion.

Airport and aviation jobs

Invest in the existing airport against documented demand

Assess hangars, aviation services and access before pursuing passenger-service or new-airport proposals.

The existing airport’s role includes opportunities to investigate business travel, medical and emergency functions, training and aviation employment. Demand-supported hangars, service businesses and access improvements form the initial program. Scheduled passenger service or a new airport requires a separate assessment of operators, passengers, airspace and long-term funding.

Locations and connections

  • Existing Roseburg Regional Airport
  • Airport-compatible employment and access areas
  • Potential commercial-air-service catchment, including competition with Eugene and Medford

Existing conditions

The City describes a runway about 5,000 feet long and 100 feet wide. Current operational records would guide any design work.

The airport master plan describes constraints involving I-5, the railway, arterial roads, terrain and aircraft approaches. No new airport site, airline service, passenger terminal or runway-extension project has been selected by this initiative.

Proposed actions

  1. Audit completed, funded and contracted safety/pavement work, airport leases, hangar demand, access and maintenance liabilities.
  2. Support demand-backed hangars, aprons, maintenance businesses and other compatible employment with viable leases and operating revenue.
  3. Coordinate any later runway/approach improvements with nearby road and rail alternatives.
  4. Commission a separate airline/airspace/terrain/weather/site/operating study only if credible service operators and employers support the demand case.
  5. Publish subsidy exposure and alternatives, including ground connections to other commercial airports, before any major relocation or terminal decision.

Intended benefits

  • More useful aviation services and potential skilled jobs
  • Revenue-producing airport uses
  • A credible route to better regional access without assuming that population alone attracts airlines

Proposed phase

Completion/demand audit now; viable hangar/support phases years 2–10; larger feasibility branch years 5–20 if warranted.

Proposed delivery lead

The City as airport sponsor, with airport management. These are proposed responsibilities; participation would need to be agreed.

Others to involve: Federal Aviation Administration · Oregon Department of Aviation · Aircraft/service operators · Employers · Oregon Department of Transportation · Central Oregon & Pacific Railroad · Affected owners.

Dependencies

  • FAA-approved planning and safety review
  • Documented aircraft/tenant demand
  • Land rights and environmental review
  • Capital and permanent operating economics

Measures of progress

  • Occupied revenue-producing facilities
  • Permanent aviation employment
  • Demand-backed leases
  • Maintenance liabilities funded
  • Verified operational/access benefits

Cost allowances and scope

These early estimates are in 2026 dollars. Several projects share the same overall allowance, so the amounts below are not added together.

Additional general aviation improvements · $25–60M

Allowance over twenty years, after existing projects are accounted for

An allowance for additional general-aviation improvements once completed, funded and contracted work has been accounted for.

Included in the shared infrastructure and civic subtotal.

  • Excludes new airport, major relocation and commercial passenger terminal.
  • Completed, funded or contracted airport work would be deducted before a new budget is adopted.
Commercial air service or relocation feasibility branch · $1–3M

Allowance for a market, airspace and site study, if commissioned

A separate study would test passenger demand, operator interest, airspace and potential sites before any relocation or airline-service decision. No construction price has been established.

The study would be funded within planning allowances; any later construction decision would need its own fully reconciled budget.

PUBLIC PLACES THAT WORK FOR EVERYONE

Maintain public spaces and reduce unsheltered homelessness.

Parks, trails and business entrances need clear access, dependable maintenance and a coordinated response to unsafe conditions. People living outside need accommodation, care and pathways to stable housing. The proposal assigns these related responsibilities to an accountable local response, with operating funding and measurable results.

Prevent housing loss

Rent assistance, landlord mediation and help accessing benefits can be targeted to households at risk of losing their home. Better coordination when someone leaves a hospital or other institution would help reduce avoidable discharges into homelessness.

Track: Households that keep their housing, alongside the number entering homelessness.

Offer usable accommodation

A current needs assessment would establish which options are missing, including around-the-clock shelter, accessible accommodation, family placements, storage, medical respite and arrangements that can accommodate pets or couples appropriately.

Track: Suitable places offered and accepted, with unmet needs shown by accommodation type.

Create housing exits

Landlord partnerships, rapid rehousing, rent assistance and permanent supportive housing would give people routes beyond a temporary bed. The support offered would need to fit the household and continue long enough to help the placement last.

Track: People moving into housing, their six- and twelve-month stability, and returns to homelessness.

Make care reachable

Outreach workers need practical connections to qualified mental-health and substance-use providers, transport and continuing care. A referral is only useful if the person can reach a suitable service and follow through.

Track: Waiting time for appropriate care and continued engagement, using privacy-protecting reporting.

Maintain public places every day

Public places need an ordinary, funded standard of care: usable restrooms, scheduled cleaning, repairs, accessible routes and a prompt response to hazards. Clear rules about conduct and use should be applied through lawful local procedures.

Track: Park condition, blocked routes, safety incidents, repair times and recurring problems.

Start with the help people actually need

The first task is to agree on a current picture with the providers doing the work: who needs help, what accommodation is available and where people get stuck. A countywide count taken on one night cannot answer those questions for every city or every type of need.

Service locations should be compared publicly for access to transport, care and work. Each would need a capable operator, a staffing budget and a neighborhood management agreement. A remote location that makes those connections harder would not deliver the outcome this plan seeks.

Give the response a lead and a lasting budget

Organizations to invite include UCAN · Housing providers · Adapt and qualified health partners · VA · Douglas County · Participating municipalities · Relevant nonprofit operators.

City and County leaders would need to identify who coordinates the response and secure five-year operating commitments with participating providers. The public should be able to see the capacity gaps, who is responsible for each part and whether the response is improving both housing stability and public-space conditions.

Clear rules need a lawful local process

Oregon law requires applicable rules on sitting, lying, sleeping or keeping warm and dry on public property to be objectively reasonable in their time, place and manner. Encampment removal also involves notice and property-handling requirements, with statutory exceptions. Local procedures would need legal review so the coordinated response works within current law.

The initial $20–40 million construction allowance covers shelter, navigation and care facilities. Permanent homes are counted in the housing budget. Staff, treatment and housing support need continuing funding beyond construction.

A PRACTICAL PATH FOR OLDER BUILDINGS

Bring downtown buildings back into use.

A building-by-building reuse program can establish which downtown properties are viable for shops, restaurants or housing and what work each requires. Roseburg’s code provides review routes for exterior changes, additions, new construction and demolition. The first assessment should combine condition, permitted use and rehabilitation cost so owners can evaluate a complete project.

  1. Know the building: Confirm its actual designation, contributing status, ownership, occupancy and applicable overlays. Separate a historic restriction from a structural, fire, access or financing problem.
  2. Price the real work: Commission a coordinated building-condition review: roof, structural/seismic condition, hazardous materials, utilities, fire/egress and accessibility. Document viable reuse options and realistic rents.
  3. Meet the reviewers early: Bring a preservation-capable architect, building official and planning/historic staff into a preapplication meeting. Ask for a written route and evidence requirements before choosing a design.
  4. Match the tenant to the building: Choose uses that fit the space and its economics. A restaurant's exhaust, grease, loading and fire needs differ from a small shop or office; upper-floor housing adds another review.
  5. Close the feasibility gap: Test owner participation, phased work, rehabilitation financing and any applicable preservation incentives with qualified advisers. Support a viable plan with public benefits and transparent terms.
  6. Pursue a documented alternative when reuse fails: If professional review shows rehabilitation cannot work, evaluate lawful replacement or other alternatives through the actual process. A project-specific record is stronger than treating every old building as either untouchable or disposable.

The proposed pilot would focus on three to five nearby properties with owners willing to participate. Each would receive a practical assessment of possible uses, repair costs, rents and approvals. Public updates could explain what is moving forward and what is holding it back, without making unsupported claims about the safety of a private building.

Select a viable first group of properties

Select the first three properties on owner participation, viable use and the prospect of a fully priced rehabilitation plan. The assessment should identify repairs, approvals, financing gaps and an operating use for each building.

Historic character can give downtown a distinctive identity, but character alone does not pay for serious structural work. The program would preserve what can work, identify where financing can close a gap, and use the proper review process when a different outcome is necessary.

Explore the downtown district

LEADERSHIP THAT TURNS PRIORITIES INTO RESULTS

Assign responsibility and publish the results.

A regional work program needs a named lead for each project, a decision schedule and a public budget. The proposed agreement brings shared priorities into one reporting system while preserving the legal authority of the elected bodies and agencies involved. Residents should be able to see delays, unresolved decisions and the party responsible for action.

Four immediate requests for public leadership

Agree on regional priorities.

Ask the city, county and participating communities to define a shared work program, responsibilities and funding. The study region is larger than the city electorate; surrounding residents need a formal place in regional planning through their own governments and agreed public participation.

Make development review predictable.

Ask Community Development and the city manager for a written approval roadmap, consolidated review comments and a clear escalation route. Roseburg already has an online permitting portal. The next question is whether applicants receive timely, consistent decisions and can understand what is holding a project up.

Coordinate the agencies a project needs.

Roseburg handles city land-use review; Douglas County provides building and electrical services in Roseburg. Utilities and highway access can involve other agencies. Ask for an early joint review of priority sites, with a named contact, studies, costs and sequence.

Publish results and act on failures.

Ask elected leaders to set standards, fund the capacity to meet them and review quarterly results. The city manager supervises staff under the charter. A missed standard should lead to an explanation and corrective action through the responsible office.

See who controls each part of deliveryReview the proposed first 90 days

Who should be involved

  • Roseburg
  • Douglas County
  • Participating neighboring cities
  • Affected utilities and service providers
  • Schools and UCC
  • Relevant tribal governments through appropriate government-to-government engagement
  • Residents and businesses

What the agreement should explain

  • The work the partnership is responsible for, and the powers it does not have.
  • The staff and project lead each participating body will provide.
  • The owner of each project and the body authorized to approve it.
  • Each participant’s contribution to construction, operations and maintenance.
  • How any shared revenue would be allocated.
  • How decisions are made and unresolved problems brought to elected leaders.
  • How financial interests are disclosed and conflicts handled.
  • The schedule for public reports on costs, decisions and results.
  • How an agency may leave the agreement and how remaining obligations would be paid.

An intergovernmental agreement does not automatically create a new taxing authority. Public decisions remain with the bodies or lawful entity authorized to make them.

RoleResponsibilityAccountability
Elected councils, County commissioners and participating boardsAdopt policy, budgets and project agreements within their authority.Public votes and clear funding/service commitments.
City manager and a named regional delivery directorKeep the shared project schedule current, resolve work that depends on several agencies, and bring clear choices to the people authorized to decide.Quarterly reports on milestones, budget changes, unresolved risks and decisions requiring elected action.
Small technical delivery teamBring planning, mapping, engineering, housing finance, grants and public participation together around the first projects.A named person responsible for each project and public approval before its scope or budget grows.
UEDP, CCD, UCC and employersMaintain the jobs, training and business-development pipeline.Written employer commitments, real wages and actual jobs filled/retained.
Utilities, safety, housing and care operatorsConfirm capacity and operate services within their responsibilities.Funded staffing, maintenance and service agreements.
Residents, businesses and community working groupsIdentify needs, compare alternatives and examine results.Published input and documented agency responses.
Private investors and philanthropic partnersSupply conditional capital and expertise for defined purposes.Disclosed interests, separate accounts and independent public decision-making.

What residents should expect from leadership

  • Appoint one lead who can bring unresolved cross-agency problems to managers and elected officials, with responsibility for keeping the work moving.
  • Require an independent review of major project costs, financing and ongoing operations before funds are committed.
  • Publish expected application and decision dates so owners and residents can follow the process; decisions would still depend on the evidence and applicable rules.
  • Use clear selection criteria, disclose interests and require people with conflicts to step aside from affected decisions.
  • Judge officials, managers and contractors against agreed results. Repeated failure should lead to changes in appointments, contracts or elected leadership through the appropriate public processes.

Roseburg's council appoints the city manager; the charter gives the manager executive responsibilities for staff, administration, budgets and contracts. Public policy and oversight remain with elected officials. A private sponsor cannot replace those authorities.

Questions for anyone seeking to lead

Residents can bring these questions to public meetings, apply for commissions and consider running for an office for which they qualify. Candidates should have the same opportunity to explain how they would fund projects, include surrounding communities and report results. Eligibility and filing information is available from the relevant election office.

  • What regional agreement would you pursue first, and which body must approve it?
  • How will the project be operated and maintained after construction?
  • What measurable outcomes will you publish each quarter?
  • How will you disclose property and financial conflicts?
  • Which housing, employment and public-space decisions can you make in the first year?
Explore public service and questions for candidatesFind public meetings and official election resources

Make progress easy to see

The result that mattersWhat the public should see
Occupied homesCompleted and occupied homes by affordability band; show preservation separately.
Year-round jobs and wagesNet permanent jobs, filled positions and real wages; exclude temporary construction from the permanent target.
Commercial activityOccupied storefronts and operator survival, not just lease announcements.
Housing stabilityDurable exits from homelessness and six/twelve-month retention.
Public-space conditionPublished inspection/repair measures and whether paths and entrances remain usable.
DeliveryCost and schedule variance, unresolved decisions and responsible parties.
Growth accountingReport annexations separately so boundary changes do not masquerade as economic improvement.

WHAT IT WOULD TAKE TO PAY FOR THE WORK

Separate capital costs, operations and funding decisions.

Creating more homes, improving infrastructure and opening businesses would require many separate investments over many years. The initial twenty-year estimate is $2.4–4.5 billion in constant 2026 dollars, including private housing and business development as well as public work. It is a way to understand the scale of this Roseburg-centered proposal. Each project still needs a defined scope, independent cost estimate and funding decision, and the needs of the wider region must be reconciled before this can become a complete regional budget.

$2.4–4.5B

Total estimated investment over twenty years

In constant 2026 dollars, including private homes and business properties alongside public infrastructure. Different projects would have different owners and funding sources.

$400–830M

The shared infrastructure and civic portion

Included in the total. Roads, utilities, parks and services each need their own approvals and funding. A full review of the wider region’s needs remains.

$15–30M / year

Additional yearly public and service costs

An initial scenario once the program is established, to be tested with service providers. It is separate from construction and excludes loan payments and ordinary private business expenses.

Fund in phases

Start with projects that can be fully funded

The first stage needs specific projects, reliable prices and a budget for ongoing care. Later projects would advance when their demand, approvals and financing are ready.

How the construction estimate is organized

ProgramLowHigh
Planning, central delivery and evaluation$20M$30M
Rail alternatives and one/two justified grade separations$80M$180M
Selected streets, transit access, walking and cycling$50M$100M
Shared water, sewer, stormwater and utility capacity$80M$150M
Parks, trails and selected family recreation projects$50M$100M
Shelter/navigation/care facilities, excluding permanent homes$20M$40M
Additional general-aviation airport improvements$25M$60M
Preparing employment sites and addressing contaminated land$35M$70M
Initial allowance for school, fire, emergency medical and other civic capacity$40M$100M
Shared infrastructure and civic subtotal$400M$830M
Housing: 5,907 homes, gross development costRoseburg UGB allocation only; includes development that might occur without this initiative. Preservation requires separate accounting.$1,772M$3,249M
Commercial/industrial buildings, fitout and opening reservesIncludes the gym and family-center concepts once. Expensive industrial production equipment is not assumed included.$200M$450M
Initial total estimate$2,372M$4,529M

Where the gym, family center and paths fit in the total

ProjectInitial allowanceWhere it is counted
48,000 sq ft gym conversion$12M–$22MExcludes property acquisition, financing and major structural remediation; no pool in the opening concept.Included in commercial/industrial portfolio.
65,000 sq ft family-center concept$30M–$50MIncludes land assumption, building, attractions and ramp-up allowance; financing/carry, escalation and exceptional off-site obligations need separate scope.Included in commercial/industrial portfolio.
Regional walking/cycling program$45M–$75MUse one project ledger; deduct completed or already-awarded work and do not add this range again.Included in transport and parks lines.

Who could help fund different kinds of projects?

Potential sourceUseRequired decision
Developer equity and appropriate debtFinancially viable housing, commercial property and employer facilities.Verify rents/sales, absorption, construction cost and completion funding.
Housing programs and tax-credit equityEligible affordable and supportive housing.Underwrite affordability and ongoing service obligations project by project.
Transportation, rail and aviation grantsEligible public infrastructure.Secure actual awards and local match; a study award is not construction funding.
Utility charges, assessments and development agreementsEligible and attributable infrastructure.Check capacity, legal basis and household/business affordability.
Urban renewal/tax incrementEligible work within an adopted plan.Model actual increment and debt service conservatively.
Philanthropy and patient investmentEarly risk, community facilities, gap funding and bounded operating support.Separate grants from investments and disclose interests.
Voter-authorized funding where requiredDefined public capital or service needs.Publish household impact, benefit and long-term operating cost.

What local public finances can support

The FY 2026–27 adopted budget lists about $32.6 million of General Fund revenue. Restricted funds, beginning balances and transfers in an all-funds budget are not unrestricted redevelopment money.

Oregon has no general sales tax. More retail spending does not automatically create a comparable City sales-tax revenue stream.

The Diamond Lake urban-renewal plan's $72.8 million maximum indebtedness is a plan limit, not available cash.

A detailed financial plan would show the cost of each service and project beside the funds available to pay for it. Existing contributions from city and county residents, districts, users and other funders must be included before any remaining gap is assigned.

How the costs would be kept clear

  • Every project needs a defined scope and an independently reviewed estimate before money is committed.
  • A development budget includes its own land, building and on-site work. The shared infrastructure budget pays only for additional common or off-site work, so the same cost appears once.
  • Permanent supportive homes belong in the housing total; shelter and care facilities are counted separately.
  • Grants, loans, tax-credit equity and donations pay for a project. They are funding sources within its cost, not extra construction costs to add on top.
  • Financing, inflation during delivery and operating reserves must be shown explicitly when projects are priced.
  • The final regional budget must account for other communities’ needs and deduct completed or already funded work.

Larger projects outside this estimate

  • A new commercial passenger airport
  • A complete ring road
  • A separately selected major river bridge
  • Catastrophic reconstruction
  • Unlimited renewal of all existing assets
  • Unreconciled projects and needs of the wider region
AN ILLUSTRATION OF EARLY PRIVATE SUPPORT

How $100 million in staged support could help

This example shows a possible allocation. No sponsor has committed these funds.

PurposeIllustrative allocation
Launch planning and delivery$5M
Revolving acquisition/options and predevelopment$20M
Downtown and shared site/access improvements$20M
Housing gap investment$15M
Shelter/care capital$10M
Parks and trails pilots$10M
Workforce and childcare partnerships$5M
Operating reserve/bridge support$15M

In this illustration, funding would be released in stages after the operator, public agreements, feasibility and ongoing costs are established. The amounts sit within the overall investment estimate. If a revolving fund reuses money repaid by a project, that reuse would be recorded separately from newly donated capital.

WHAT HAPPENS FIRST, AND WHAT FOLLOWS

Stage investment around evidence and approvals.

  1. Start now

    Start with the community

    • This site gives residents a regional map, specific ideas, the research behind them and a way to suggest corrections.
    • The questionnaire asks which improvements matter, which businesses people would use and how often they travel into the area. Responses can help choose the next questions to investigate.
    • Owners, operators, employers and residents can share their interest through the participation forms.
    • A proposed next stage is a regular public update showing what has been learned, what changed and which decisions need attention.

    How this stage would be funded: The website and initial community research can proceed before a separately funded professional development program exists.

    What is needed before moving on: A useful first stage gives people a working way to participate and reports honestly on what their responses do and do not establish.

  2. Days 1–30 of a funded program

    Agree who will lead

    • Willing agencies, communities, utilities, schools, relevant tribal governments and operators would meet to define the first shared work.
    • The participating bodies would name a project lead and confirm who has authority over each decision.
    • They would agree the initial scope, reporting schedule and rules for financial conflicts.

    How this stage would be funded: This work is included in the proposed first-100-day professional preparation allowance.

    What is needed before moving on: The program can move forward when responsibilities are clear and the initial professional work has an agreed scope and budget.

  3. Days 30–60

    Check the first sites and service needs

    • The team would confirm the regional population baseline and begin research into where potential customers live and how they travel.
    • It would review existing businesses, current service contributions and the housing needs of participating communities.
    • Building and lease review for the gym, an initial planning meeting for the family-center site, and housing utility studies would begin.

    How this stage would be funded: This stage remains within the initial professional work program.

    What is needed before moving on: Public findings should distinguish verified information from the questions that still need an answer.

  4. Days 60–100

    Choose a first group of deliverable projects

    • The public would receive a comparison of the flagship and retail candidates, including likely operators, property conditions, approvals and costs.
    • Three to five downtown properties and the first housing or service projects would be selected where the evidence supports them.
    • City, County and providers would agree responsibility for the housing and homelessness response.
    • Transportation staff and communities would select the most useful early walking, cycling and crossing improvements.

    How this stage would be funded: The full first-100-day formation and technical review is provisionally allowed $1–2 million. Its scope and professional fees must be priced before funding; this is separate from launching the civic website.

    What is needed before moving on: Each selected project needs an accountable lead, credible demand and a public explanation of why it should advance or pause.

  5. Months 4–24

    Make visible improvements

    • Participating bodies would approve project-specific agreements covering funding and responsibility.
    • Where justified, owners and developers would arrange conditional property control while the remaining approvals are completed.
    • Repairs, downtown conversions and manageable park or street improvements could begin.
    • Viable housing phases would complete their service, infrastructure and any annexation arrangements.

    How this stage would be funded: The illustrative early phase allows $25–50 million in conditional commitments within the overall estimate. Actual spending would depend on project readiness and financing.

    What is needed before moving on: Construction begins when approvals, defined costs, an operating plan and funding are in place.

  6. Years 2–5

    Build the first coordinated phases

    • Housing, business and corridor projects that have passed the earlier reviews would enter construction and operation.
    • Downtown and employer programs that demonstrate results could expand.
    • Major infrastructure would continue through the engineering, environmental and approval stages required for its particular location.

    How this stage would be funded: The earlier planning scenario allows $0.6–1.3 billion for this period, including roughly 1,500–1,865 homes. It illustrates a possible scale of development, not a forecast or funding commitment.

    What is needed before moving on: Each expansion should reflect current demand, construction costs, affordability and the performance of earlier projects.

  7. Years 5–10

    Expand the work that earns support

    • Additional housing and employment sites would be prepared where demand and service capacity support them.
    • Family destinations and major infrastructure would proceed when their business or public-service case and funding are established.
    • Programs that miss their demand or operating goals would be changed before receiving further investment.

    How this stage would be funded: Later phases would receive individual budgets within the updated regional plan.

    What is needed before moving on: Expansion requires demonstrated demand, complete construction funding and a funded plan for operation and renewal.

  8. Years 10–20

    Keep the places we build working

    • The region would complete the connections and homes still needed, based on updated evidence.
    • Earlier streets, parks, buildings and facilities would receive maintenance and renewal, while land and service plans are refreshed.
    • Any larger airport, bridge or other optional project would still need its own assessment and decision.

    How this stage would be funded: Costs and public finances would be reviewed annually as later projects are considered.

    What is needed before moving on: Long-term success means places that remain useful and well maintained after construction ends.

The questions every project needs to answer

Need

Who will use it, how often, at what achievable price, and what already exists?

Operator

Who is accountable for daily performance, staffing and losses?

Site

Are ownership, property rights, access, hazards and allowed use established?

Design and cost

Has the complete program been tested and independently priced?

Approval

Which public bodies decide, what process applies, and what remains unresolved?

Capital

Are all construction, financing and ramp-up sources committed?

Operations

Is there a credible five-year operating plan and long-term renewal model?

Public benefit

Are the costs, benefits, conflicts, affordability and displacement effects visible?

The first decisions local leaders could take together

DecisionWho would need to actWhat residents would get
Agree on a regional planning and service baseline.City, County and partner governments with providers and residents.An agreed description of the region, with a public account of service costs and the contributions already made by residents, users and districts.
Choose a concentrated downtown pilot.Willing property owners, City reviewers and qualified developers/operators.Three to five nearby buildings with willing owners, priced reuse options, prospective tenants and a clear approval process.
Verify flagship and retail sites.Owners, operators, planners and independent technical advisers.An understandable comparison of property conditions, permitted uses, access, costs, competing businesses and operating economics.
Choose the first serviceable housing phases.Planning departments, utilities, housing developers and financing partners.The first housing phases with a practical mix of homes, enough usable land, utility capacity and clear responsibility for infrastructure and services.
Name the public-space and housing-response lead.County/City, UCAN, care and housing partners.A coordinated response showing missing capacity, operating responsibility, lawful procedures and results the public can track.
Adopt the delivery compact and scoreboard.Participating elected bodies and managers.A written agreement naming project leads, decision dates, funding responsibilities and a schedule for public progress reports.

Read the November 8 planning baseline.

The 52-page study and 10-page concept atlas preserve the November 8, 2026 research baseline. Later additions are documented on the Updates page and linked current chapters. The research page explains the sources and limits of the estimates.

Read the research and maps
Help organize the next step
HELP SET THE REGIONAL PRIORITIES

What should Greater Roseburg
work on first?

See how to get involved

COMMUNITY QUESTIONNAIRE · 1 OF 3

Which businesses and activities would you use?

Tell us what you would use, what matters most and what we may have missed. Your answers help choose priorities for further research. Email is optional.

Ideas for improving an existing local business are welcome, too.