The parks and trails program connects existing destinations through missing path segments, accessible entrances and safer crossings. Local routes should serve school trips, errands and recreation in Roseburg and partner communities. Shade, working restrooms, seating and funded maintenance are part of the same investment.
Find the proposed walking and cycling connections in your community
The 25 route packages connect neighborhoods, schools, parks and services across the region. Some build on existing paths; others follow published plans or identify gaps for local study. Each entry identifies the connection, its source status and unresolved access conditions.
Timings are proposed periods after the work is funded. These descriptions are planning ideas, not directions for a currently continuous or protected route.
Roseburg · Proposed timing: 0–3 yearsThe river parks, joined up
A family outing could move easily between Stewart, River Front, Gaddis and Fir Grove parks, with clear entrances from surrounding neighborhoods and businesses. The priority is to repair and complete short links, improve crossings and make the existing network easier to use.
Places along the connection: Stewart Park · River Front Park · Gaddis Park · Fir Grove Park
Where it stands: Existing paths and parks; access and maintenance improvements proposed.
New work would fit the City’s current Stewart, Gaddis and greenway planning. The immediate focus is on the missing connections and care that make existing places more useful.
Roseburg · Proposed timing: 1–5 yearsNewton Creek: neighborhoods to the YMCA and Stewart
The Newton Creek concepts could give nearby households a more comfortable route to Hucrest, the YMCA, Charles Gardiner Park and the Stewart shopping district. The proposal focuses on the short missing links between existing sections, beginning with ownership and engineering review.
Places along the connection: Hucrest Elementary, 1810 NW Kline · YMCA/Harvey · Charles Gardiner Park
Where it stands: Published path concepts; current completion and access rights need confirmation.
Creek setbacks, wetlands, crossings and ownership will determine the route. Any section on private land would need an agreed public right of access.
Roseburg · Proposed timing: 1–5 yearsGarden Valley: Duck Pond to shopping and fitness
A continuous connection from Duck Pond and the I-5 path toward Garden Valley businesses could turn a workout and an errand into one walking or cycling trip. Driveway crossings and secure bicycle parking at business entrances are essential parts of the proposal.
Where it stands: Connection identified in transportation planning; design and agreements remain.
The public-road option would be compared with an alternative involving the Veterans Affairs campus, which would require agreement. Any connection to the proposed gym also depends on the business and property arrangements.
Roseburg · Proposed timing: 1–7 yearsHarvard, Fir Grove and Stewart
This proposal would improve walking and cycling along Harvard and separately address the south-bank gap between Fir Grove and Stewart. The goal is to connect neighborhood homes, shops and park entrances while giving particular attention to turning traffic at crossings.
Where it stands: Existing park connections with additional links proposed.
The school district plans to close Fir Grove Elementary after 2026–27; the park remains a destination for this proposal. Any riverbank connection would need to respect private ownership and floodplain requirements.
Roseburg · Proposed timing: 0–5 yearsDowntown to Micelli and Templin parks
A park visit and a meal downtown should feel like parts of the same outing. Calmer streets, better crossings and clearer transitions between existing paths and streets could make the connections to Micelli and Templin more comfortable for families.
Where it stands: Existing parks and a mixture of paths and streets; improvements proposed.
Parts of the trip would remain on streets rather than a separate river trail. Changes at the railway would require approval from the railroad and the responsible transportation authorities.
Roseburg · Proposed timing: 2–10 yearsEast Roseburg to Sunshine Park
The long-term aim is a comfortable route between eastside homes, daily services and Sunshine Park. Work would begin with the neighborhood links and crossings people need most, coordinated with planning for OR 138, then extend toward the park as suitable sections become feasible.
Where it stands: Existing park; a continuous protected connection remains to be studied.
Traffic speeds, driveway movements, slopes, creek and floodplain conditions, and road jurisdiction will influence the final route.
Roseburg fringe · Proposed timing: With housing phasesCharter Oaks: connected from the first homes
New housing in Charter Oaks should include a connected street and path network, a nearby play space and safe access to daily destinations. Each approved phase would connect to existing roads and preserve useful future links so families are not left waiting for a later development to make the neighborhood work.
Where it stands: A proposed standard for new development; no specific path alignment selected.
Land inside the urban growth boundary still needs the relevant approvals, utilities and public-path arrangements. The first homes should work without relying on an unapproved river bridge.
Roseburg fringe · Proposed timing: 3–10+ yearsA better approach to River Forks
River Forks could be easier to reach and enjoy, beginning with its entrance and nearby walking access. A longer, separated regional approach deserves study along actual road corridors, with traffic, bridge conditions and land rights assessed before a route is selected.
Where it stands: Existing County park; a regional connection is a longer-term study.
No continuous Roseburg-to-River Forks riverbank path has been verified. A route intended for families would need more protection than an ordinary rural road shoulder.
Green · Proposed timing: 0–5 yearsGreen: schools, shops and Happy Valley Park
Green’s neighborhood network would connect homes and both elementary schools to daily shopping and Happy Valley Park. The first improvements would close sidewalk gaps and address crossings, building on the Carnes school frontage already completed.
Places along the connection: Green Elementary, 4498 SW Carnes · Sunnyslope Elementary, 2230 SW Cannon · Happy Valley Park, 100 Poteet
Where it stands: Existing road improvements, with remaining connections to assess.
Douglas County would lead work on its roads in unincorporated Green. Park approaches need their own review, and the project does not depend on annexation.
Winston · Proposed timing: 0–3 yearsWinston: McGovern and Lookingglass
The McGovern-area school-route investment can become the foundation for a wider neighborhood network. After confirming what the existing grant delivered, the proposal would close the remaining links toward shops and the town loop, including the Lookingglass crossings at Cary, Brockway and Abraham.
Where it stands: A 2023 Safe Routes to School grant is documented; current completion needs confirmation.
The first review would distinguish completed and funded work from genuinely new improvements, so the same project is not paid for twice.
Winston · Proposed timing: 1–5 yearsWinston: schools, Riverbend and Community Park
Safer Thompson crossings at Gregory and Darrell could help join schools with Riverbend Park. Connections through calmer neighborhood streets could continue toward Community Park and the community center, creating a useful local loop for an after-school trip or family walk.
Places along the connection: Winston Middle, 330 Thompson · Riverbend Park, 223 Thompson · Community Park, 440 SE Grape
Where it stands: Existing schools and parks; additional street and crossing improvements proposed.
Crossings of OR 42 and Main Street need careful design for traffic speed and turning movements. A line on the map alone cannot make those crossings comfortable.
Sutherlin · Proposed timing: 0–3 yearsSutherlin: Red Rock to downtown
The Red Rock Trail could serve more everyday trips with clearer links from its ends and nearby neighborhoods to downtown shops, civic services and Central Park. The first phase would build on the existing paved trail and the Central Avenue crossing work.
Places along the connection: Red Rock trail, South State–Nicholas Court · Festival Grounds · Central Park
Where it stands: Approximately 1.3 miles of existing paved trail; Central crossings were programmed for fall 2026.
A current review would confirm the pedestrian-beacon work at Mardonna and between Grant and Kruse before additional improvements are defined.
Sutherlin · Proposed timing: 1–5 yearsSutherlin: schools and Hartley Park
Continuous sidewalks, calmer cycling routes and safer crossings along West Sixth and East Fourth could link homes, schools and Hartley Park. The proposal would concentrate on the gaps that prevent residents from completing those trips comfortably today.
Where it stands: Connections identified in City transportation planning and June 2026 draft park recommendations.
Any new connecting street or path across private property would require the appropriate public process and land agreement.
Sutherlin · Proposed timing: 1–8 yearsSutherlin: reach Ford’s Pond from the neighborhood
Ford’s Pond already offers a paved park loop. Better approaches from southwest neighborhoods could help more residents make it part of everyday life. A connection for neighborhoods east of I-5, potentially involving an underpass, would be evaluated as a separate and more complex project.
Where it stands: Existing park loop; additional road approaches and an I-5 connection proposed.
An I-5 connection needs engineering, drainage and utility review, land rights and the necessary approvals. This proposal does not identify an existing public underpass path.
Sutherlin · Proposed timing: 3–10 yearsSutherlin: toward Cooper Creek
A comfortable connection from the Red Rock system toward Cooper Creek Reservoir could add a longer recreation option. The first steps would improve trailhead access and useful links from homes along public roads while the feasibility of a continuous route is assessed.
Where it stands: Existing reservoir recreation trails; the connection from town remains a study.
A creekside route would require public access rights and environmental review. No off-road alignment has been selected.
Oakland · Proposed timing: 0–5 yearsOakland: schools and the town center
Accessible crossings and continuous sidewalks along Fifth could join the school campus with the Oak and Maple neighborhoods and downtown. A compact route on existing public streets would help make school, local errands and a walk around town easier to combine.
Where it stands: Existing school facilities and earlier route recommendations; current construction status needs review.
Cypress work was described as funded or underway in 2020 and should be checked first. A possible Ash Creek path from First to Eighth is a separate longer-term study.
Drain · Proposed timing: 0–3 yearsDrain: school to downtown on East A and B
The proposal would improve East B sidewalks, rail-crossing access and school crossings so the elementary and middle school have a more comfortable connection to downtown services. The named gaps provide a practical starting point for a first phase.
Places along the connection: North Douglas Elementary/Middle, 100 N School
Where it stands: Priorities identified in the April 2025 Safe Routes to School plan; delivery status needs confirmation.
Changes at the railway require rail-authority review. The route concerns the East A and East B streets serving this school and downtown area.
Drain · Proposed timing: 0–5 yearsDrain: high school to Anna Drain Park
A safer route via Moreland could link the high school with Anna Drain Park and the park’s improvement and reading-walk work. The proposal includes missing sidewalks, the park-road crossing and protected passage where the route goes under the railway.
Places along the connection: North Douglas High, 305 S Main · Anna Drain Park
Where it stands: Existing destinations and park work, with route improvements proposed.
The undercrossing needs clearance and drainage assessment. The 2025 plan proposed reopening the covered bridge; its current status must be confirmed before it becomes part of a public route.
Yoncalla · Proposed timing: 0–5 yearsYoncalla: schools, Main Street and community life
First, Birch and Fifth form a starting point for a route between the elementary and secondary schools. The proposal would fill sidewalk gaps, calm traffic and improve connections toward Main Street services and the community center, while assessing the Williams Road park approach with its operator.
Places along the connection: Elementary, 401 First · Middle/High, 292 Fifth · Community Center, 400 Main
Where it stands: A new connection proposal using identified streets and destinations.
Park entrances and public access still need local confirmation. School grounds cannot be assumed to provide a public shortcut, and a continuous protected loop has not yet been established.
Myrtle Creek · Proposed timing: 0–5 yearsMyrtle Creek: safer trips around the schools
Crossings at Rice and Spruce and at Division and Spruce would anchor a more useful neighborhood school network. Short connections along Johnson, Spruce and Neal could bring homes into that network, while the Division–Myrtle Road junction receives specific attention to freight movements.
Places along the connection: Coffenberry Middle, 591 NE Rice · Myrtle Creek Elementary
Where it stands: Priorities identified in the April 2022 Safe Routes to School plan; current delivery needs review.
Truck turns, visibility and crossing protection require engineering at Myrtle Road. The treatment needs to match the actual traffic conditions.
Myrtle Creek · Proposed timing: 1–5 yearsMyrtle Creek: parks, shops and downtown
An accessible circuit could connect Millsite Park, downtown shops and Evergreen Park using existing streets and park paths. Better downtown crossings and links to the school-route network would make the trip useful for local errands as well as recreation.
Places along the connection: Millsite Park, 231 Volunteer · Evergreen Park · Downtown Main/Volunteer
Where it stands: Existing parks and streets; a more complete connection is proposed.
Evergreen’s entrance should be checked locally. A creekside path would only be included where public access is confirmed.
Tri-City · Proposed timing: 1–7 yearsTri-City: Chadwick to daily services
Safer school access along Chadwick and a protected connection toward Old Pacific services could make everyday trips easier. As housing is added, connected internal streets and a need-tested neighborhood play space could help create a stronger local center.
Places along the connection: Tri-City Elementary, 546 SW Chadwick
Where it stands: A school and public-road connection to assess, with a fresh park-access review needed.
Road jurisdiction and highway driveway conflicts need to be resolved. The older park inventory cannot establish what residents can access today.
Riddle · Proposed timing: 0–5 yearsRiddle: a walk through the community
Schools, Main Street shops, City Park and the community center could form a compact route for walking and low-speed cycling. The proposal would prioritize crossings and missing sidewalks around Park and First, making the destinations easier to reach from surrounding homes.
Places along the connection: Elementary, 463 Park · Junior/Senior High, 147 Main · Community Center, 123 Parkside · Riddle City Park
Where it stands: Existing destinations; a local street and access assessment is proposed.
Park entrances and accessibility need confirmation. Any freight street requires a treatment suited to its traffic, and no private cut-through is assumed.
Canyonville · Proposed timing: 0–5 yearsCanyonville: Main Street to Pioneer Park
The completed North Main school-route work gives Canyonville a strong starting point. Filling the remaining downtown-to-Pioneer Park sidewalk and crossing gaps could extend its value, while maintaining the new infrastructure and its connections to school, civic uses and businesses.
Places along the connection: Canyonville School, North Main · Pioneer Park, East Fourth/Canyon
Where it stands: North Main work reported complete in the 2026 acceptance record; further links proposed.
The creek footbridge and the actual park entrance need an accessibility check. Completed Main Street improvements are not new construction costs in this proposal.
Canyonville fringe · Proposed timing: 3–10 yearsCanyonville: a comfortable route to Stanton Park
Stanton Park’s improvements create a reason to examine better access from nearby homes and North Main. The study would focus on road approaches and crossings first, then determine whether families could reach the park on a suitably protected route.
Where it stands: Existing improved County park; the connection remains a study.
I-5, river and road crossings need specific assessment. No new bridge or guaranteed family cycling route has been selected.